The report warns that NTEC's potential acquisition of a larger stake in the Four Corners Power Plant is a high-risk investment. IEEFA estimates that NTEC could face production cost losses between $350 million and $400 million from 2021 to 2031 if it increases its ownership to 20%. The analysis identifies six primary risks: the advanced age of the plant, declining electricity production, low natural gas prices, competition from low-cost renewables, high production costs, and environmental liabilities related to coal ash and water pollution.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • IEEFA estimates that if NTEC acquires PNM's 13% share, it is likely to incur production cost losses of at least $350 million to $400 million between 2021 and 2031, including losses from its existing 7% stake. These figures exclude the purchase price and potential environmental clean-up costs for the plant or the Navajo Mine.
  • Four Corners Units 4 and 5 are among the oldest large coal plants in the U.S., having entered service in July 1969 and July 1970 respectively. Their age contributes to higher operating and maintenance costs, lower reliability, and decreased efficiency (higher heat rates).
  • The plant's electricity production has declined significantly, with the average capacity factor for Units 4 and 5 dropping from 71% (2010-2014) to 59% (2015-2019). In the first four months of 2020, the capacity factor further declined to 48%.
  • Low natural gas prices at the SoCal Border Hub and the growth of the Western Energy Imbalance Market (EIM) undermine the plant's profitability by displacing coal generation and lowering overall energy market prices at the Palo Verde Hub.
  • Renewable energy, particularly solar and wind, presents growing competition due to dramatic price declines. Solar power purchase agreements (PPAs) have fallen by more than 80%, with some recent agreements in New Mexico priced as low as $15/MWh.
  • The cost of producing electricity at Four Corners has exceeded the selling price at the Palo Verde Hub every year since 2011. This gap is expected to widen as the plant ages and maintenance costs increase.
  • The plant faces significant environmental liabilities, including a coal ash surface impoundment that is leaking into watersheds and legal challenges from conservation groups regarding the adequacy of its water pollution permits.

Cite the original document

APA
Schlissel, D. (2020). Another Expensive Mistake by NTEC. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Another-Expensive-Mistake-by-NTEC_July-2020.pdf
Chicago
Schlissel, David. Another Expensive Mistake by NTEC. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/resources/Another-Expensive-Mistake-by-NTEC_July-2020.pdf.
Wikipedia
{{cite report |last1=Schlissel |first1=David |title=Another Expensive Mistake by NTEC |publisher=Institute for Energy Economics and Financial Analysis |date=July 2020 |url=https://ieefa.org/sites/default/files/resources/Another-Expensive-Mistake-by-NTEC_July-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000938)}}
BibTeX
@techreport{schlissel2020another, author = {Schlissel, David}, title = {{Another Expensive Mistake by NTEC}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = jul, url = {https://ieefa.org/sites/default/files/resources/Another-Expensive-Mistake-by-NTEC_July-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000938} }

Full text

Collected · Record updated