The IEEFA report argues that the Adani Godda power project is a poor strategic fit for Bangladesh, providing high-cost electricity while locking the country into a 25-year emissions-intensive contract. The analysis suggests the project is designed to benefit Adani Power and prop up its distressed Carmichael coal project in Australia. IEEFA highlights Adani Power's severe financial distress, including a net debt of US$7.2 billion, and notes that the project's timeline is unrealistic, with operational dates pushed to 2022. The report recommends that Bangladesh instead expand domestic solar capacity and import technology-agnostic electricity from India's existing and renewable generation capacity.
Key insights
- The estimated electricity tariff for the Godda project is significantly higher than other new generation options for Bangladesh, making it one of the most expensive sources of power. IEEFA estimates a tariff of approximately Tk8.71/kWh, which exceeds costs for natural gas, imported LNG, and solar PV projects.
- The project is viewed as a strategic attempt to support Adani's struggling Carmichael coal project in Australia. Because the power purchase agreement (PPA) allows for full cost pass-through of imported coal and rail charges, the project provides a destination for Carmichael coal that would otherwise be stranded due to the unviability of Adani's Mundra plant.
- Adani Power is in severe financial distress, which creates a significant risk that the Godda plant may never be completed. The company reported a US$227 million net loss for the nine months ending 31 December 2017, and its net debt of US$7.2 billion is more than 16 times its shareholder equity.
- The 25-year PPA locks Bangladesh into polluting thermal power at a time when Indian electricity distribution companies are moving away from long-term thermal contracts in favor of cheaper renewable energy. Indian solar and wind tariffs have fallen significantly, with wind power reaching Rs2.43/kWh in December 2017.
- Bangladesh could meet its power needs more efficiently by importing electricity from India's existing spare generation capacity or by expanding domestic solar power. A USAID study indicated that increasing imports from India to 30% of total supply would be cheaper than domestic coal-fired generation.
Cite the original document
- APA
- Buckley, T., & Nicholas, S. (2018). Adani Godda Power Project Too Expensive, Too Late, and Too Risky for Bangladesh. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Adani-Godda-Power-Project-April_2018.pdf
- Chicago
- Buckley, Tim, and Simon Nicholas. Adani Godda Power Project Too Expensive, Too Late, and Too Risky for Bangladesh. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/sites/default/files/resources/Adani-Godda-Power-Project-April_2018.pdf.
- Wikipedia
- {{cite report |last1=Buckley |first1=Tim |last2=Nicholas |first2=Simon |title=Adani Godda Power Project Too Expensive, Too Late, and Too Risky for Bangladesh |publisher=Institute for Energy Economics and Financial Analysis |date=April 2018 |url=https://ieefa.org/sites/default/files/resources/Adani-Godda-Power-Project-April_2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000918)}}
- BibTeX
- @techreport{buckley2018adani, author = {Buckley, Tim and Nicholas, Simon}, title = {{Adani Godda Power Project Too Expensive, Too Late, and Too Risky for Bangladesh}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = apr, url = {https://ieefa.org/sites/default/files/resources/Adani-Godda-Power-Project-April_2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000918} }
Full text
Collected · Record updated