The document argues that rushing to build new gas-fired capacity exposes consumers to significant price volatility and stranded-cost risks. Through three case studies, it contrasts Entergy's heavy investment in gas with Holy Cross Energy's successful shift to 85% clean energy and Portland General Electric's state-mandated decarbonization efforts.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Gas price volatility creates substantial financial burdens for consumers, as seen in January 2026 when PJM wholesale energy costs reached $15.4 billion and New England's costs hit $2.7 billion, the highest since 2003, driven by Henry Hub gas prices averaging $7.72 per MMBtu.
  • Entergy Corporation is heavily prioritizing gas-fired capacity over renewables, with more than 8.2 GW of new gas capacity under construction and an additional 8 GW of unallocated turbine slots, while its projected solar capacity by 2030 has dropped from an earlier 11 GW goal to just over 4 GW.
  • Entergy's strategy poses financial risks to consumers, including potential stranded costs if data center demand fails to materialize and exposure to gas price volatility, as 15- to 20-year power agreements do not cover the 35-year-plus life expectancy of gas assets.
  • Holy Cross Energy has successfully transitioned to an 85% clean energy mix as of 2025, achieving electricity costs 33% below the national average through a combination of renewable contracts, battery storage, and demand-reduction programs.
  • Portland General Electric (PGE) has reduced its reliance on fossil fuels due to state legislation (HB 2021) and legal mandates, reaching 46% renewable generation in 2025 and committing to over 4,200 MW of clean energy resources since 2021.
  • PGE's modeling indicates that by 2030, it will not require thermal generation for five months of the year, though it still needs to determine a dispatchable resource to replace its five gas-fired plants (1,827 MW capacity) for the remaining periods.

Cite the original document

APA
Wamsted, D. (2026). Stampede To Gas. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-04/41235_BriefingNote_StampedeToGas%20%282%29.pdf
Chicago
Wamsted, Dennis. Stampede To Gas. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/sites/default/files/2026-04/41235_BriefingNote_StampedeToGas%20%282%29.pdf.
Wikipedia
{{cite report |last1=Wamsted |first1=Dennis |title=Stampede To Gas |publisher=Institute for Energy Economics and Financial Analysis |date=April 2026 |url=https://ieefa.org/sites/default/files/2026-04/41235_BriefingNote_StampedeToGas%20%282%29.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000904)}}
BibTeX
@techreport{wamsted2026stampede, author = {Wamsted, Dennis}, title = {{Stampede To Gas}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = apr, url = {https://ieefa.org/sites/default/files/2026-04/41235_BriefingNote_StampedeToGas%20%282%29.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000904} }

Full text

Collected · Record updated