The report examines how Indonesia's massive expansion of coal-fired power plants through various Fast Track Programs has created a financial crisis for the state utility PLN, characterized by oversupply and a heavy reliance on government subsidies. It argues that transitioning to solar and wind energy—which are now more cost-competitive and faster to deploy—can reduce operational costs and help Indonesia meet its climate targets.
Key insights
- Indonesia is failing to meet its renewable energy targets, with the renewable energy mix reaching only 13.1% in 2023. The country has utilized only 0.4% of its total renewable energy potential through December 2023, with solar and wind power being particularly under-developed: solar has reached only 0.017% of its potential (574 MW of 3,293 GW) and wind only 0.001% (154 MW of 155 GW).
- The Government of Indonesia's (GOI) mandate for massive coal-fired power plant expansion via Fast Track Programs (FTP-1, FTP-2, and FTP-3) has led to a significant electricity oversupply. This has locked PLN into 'take-or-pay' agreements with independent power producers (IPPs), forcing the utility to pay for excess power it cannot sell.
- PLN's reported profits are artificially inflated by government support. In 2022, the GOI provided approximately IDR 123 trillion (US$ 8 billion) in subsidies and compensation to PLN; without this support, the utility would face significant net losses. Furthermore, PLN's liquidity ratios (current, quick, and cash) are all below 1, indicating that its short-term debts exceed its liquid assets.
- Coal-fired power plants (CFPPs) are becoming a financial drain due to increasing maintenance costs and inefficiency. As of December 2023, 23% of PLN's 20.4 GW of coal capacity has been operating for over 20 years. The report notes that coal purchasing costs rose by 49% between 2017 and 2022, while energy production did not increase proportionally.
- Solar and wind energy present a viable financial and operational alternative because they have lower Levelized Costs of Energy (LCOE) and significantly shorter construction times than fossil fuel or hydro plants. A 10 MW solar PV project can be completed in approximately nine months, and wind projects average 18 months.
Cite the original document
- APA
- Yustika, M. (n.d.). Pathways to Financial Sustainability for PLN through Renewable Energy Development. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-05/20240513%20-%20Pathways%20to%20Financial%20Sustainability%20for%20PLN%20through%20Renewable%20Energy%20Development.pdf
- Chicago
- Yustika, Mutya. Pathways to Financial Sustainability for PLN through Renewable Energy Development. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2024-05/20240513%20-%20Pathways%20to%20Financial%20Sustainability%20for%20PLN%20through%20Renewable%20Energy%20Development.pdf.
- Wikipedia
- {{cite report |last1=Yustika |first1=Mutya |title=Pathways to Financial Sustainability for PLN through Renewable Energy Development |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2024-05/20240513%20-%20Pathways%20to%20Financial%20Sustainability%20for%20PLN%20through%20Renewable%20Energy%20Development.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000898)}}
- BibTeX
- @techreport{yustikandpathways, author = {Yustika, Mutya}, title = {{Pathways to Financial Sustainability for PLN through Renewable Energy Development}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2024-05/20240513%20-%20Pathways%20to%20Financial%20Sustainability%20for%20PLN%20through%20Renewable%20Energy%20Development.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000898} }
Full text
Collected · Record updated