The Narrabri Gas Project – Supplementary Submission to the Independent Planning Commission

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The IEEFA argues that the Narrabri Gas Project is economically unviable and unnecessary. It claims that domestic gas demand has fallen by 21% since 2014 and that gas-powered generation has declined by 58% in the same period. The document asserts that the project will not lower prices because a 'cartel' of five companies—Santos, BHP, Exxon, Shell, and Origin Energy—manipulate domestic prices above international levels. Furthermore, it argues that Narrabri gas is non-competitive with imported LNG once transport costs to Sydney (estimated at over $2/GJ) are included, bringing the total cost to approximately $8.50/GJ. Finally, the submission highlights that large-scale battery storage is rapidly replacing the role of gas peaking plants in the power grid.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Australian domestic gas consumption is in a clear downtrend, having decreased by 21% since 2014, contradicting claims by Santos and Acil Allen that demand is 'relatively flat'.
  • The Narrabri Gas Project will not increase competition or lower prices because five companies—Santos, BHP, Exxon, Shell, and Origin Energy—effectively operate as a cartel, pricing domestic gas above international parity since 2014.
  • Narrabri gas is not cost-competitive with imported LNG when transport costs are included; the estimated cost to reach Sydney is $8.50/GJ, comprising $6.40/GJ at the well head and over $2/GJ for pipeline transmission.
  • Gas usage for power generation has fallen by 58% since 2014, and the role of gas as a partner for renewables is being usurped by large-scale battery storage.
  • Global and domestic trends show batteries are scaling to rival gas peaking plants, exemplified by Vistra's 1,500MW project in California and Neoen's proposed Goyder South project in South Australia.

Cite the original document

APA
Robertson, B. (2020). The Narrabri Gas Project – Supplementary Submission to the Independent Planning Commission. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/200821-institute-for-energy-economics-and-financial-analysis.pdf
Chicago
Robertson, Bruce. The Narrabri Gas Project – Supplementary Submission to the Independent Planning Commission. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/resources/200821-institute-for-energy-economics-and-financial-analysis.pdf.
Wikipedia
{{cite press release |last1=Robertson |first1=Bruce |title=The Narrabri Gas Project – Supplementary Submission to the Independent Planning Commission |publisher=Institute for Energy Economics and Financial Analysis |date=August 2020 |url=https://ieefa.org/sites/default/files/resources/200821-institute-for-energy-economics-and-financial-analysis.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000894)}}
BibTeX
@misc{robertson2020narrabri, author = {Robertson, Bruce}, title = {{The Narrabri Gas Project – Supplementary Submission to the Independent Planning Commission}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = aug, url = {https://ieefa.org/sites/default/files/resources/200821-institute-for-energy-economics-and-financial-analysis.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000894} }

Full text

Collected · Record updated