Decision Time: Poland's PGE - Why high-risk fossil-heavy strategy doesn't add up
Summary
The report finds that PGE's strategy of doubling down on coal is financially risky and more costly than a transition to renewables, with a 'Wait' scenario estimated to be €3 billion more expensive than a 'Hurry' shift to renewables.
Key insights
- PGE is heavily dependent on fossil fuels, with hard coal and lignite plants accounting for 91% of total generation in 2017, while renewables contributed only 4%.
- The European Union's 2021 air pollution emission standards (BREF) pose a significant risk to PGE, as only four out of 15 of the utility's smokestacks met these standards for all three pollutants in 2016 and/or 2017.
- Compliance with BREF standards is estimated to increase generation costs by 15% (to roughly €40/MWh) for a sample lignite plant and by 10% (to €50/MWh) for a coal-fired combined heat and power (CHP) plant.
- Renewable energy costs in Poland are broadly competitive with coal and lignite, with estimated costs of €39/MWh for onshore wind, €62/MWh for offshore wind, and €82/MWh for solar power.
- A 'Hurry versus Wait' analysis indicates that maintaining the existing energy mix (the 'Wait' scenario) is €3 billion more costly than an overnight shift to 100% renewables, as capacity payments fail to offset carbon costs.
- PGE faces significant financial risks from rising EU allowance (EUA) prices and a reliance on Poland's new capacity market, which may not cover the costs of BREF upgrades.
Cite the original document
- APA
- Coghe, G. W. P. (2018). Decision Time: Poland's PGE - Why high-risk fossil-heavy strategy doesn't add up. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/decision-time-polands-pge-why-high-risk-fossil-heavy-strategy-doesnt-add
- Chicago
- Coghe, Gerard Wynn Paolo. Decision Time: Poland's PGE - Why high-risk fossil-heavy strategy doesn't add up. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/resources/decision-time-polands-pge-why-high-risk-fossil-heavy-strategy-doesnt-add.
- Wikipedia
- {{cite report |last1=Coghe |first1=Gerard Wynn Paolo |title=Decision Time: Poland's PGE - Why high-risk fossil-heavy strategy doesn't add up |publisher=Institute for Energy Economics and Financial Analysis |date=1 May 2018 |url=https://ieefa.org/resources/decision-time-polands-pge-why-high-risk-fossil-heavy-strategy-doesnt-add |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000694)}}
- BibTeX
- @techreport{coghe2018decision, author = {Coghe, Gerard Wynn Paolo}, title = {{Decision Time: Poland's PGE - Why high-risk fossil-heavy strategy doesn't add up}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = may, url = {https://ieefa.org/resources/decision-time-polands-pge-why-high-risk-fossil-heavy-strategy-doesnt-add}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000694} }
Full text
Collected · Record updated