The Adani Group's Godda coal power project is increasingly out of step with Indian and Bangladeshi energy strategies due to a shift toward domestic coal, renewables, and a reduction in coal-fired power capacity in Bangladesh.
Key insights
- The Godda power project contradicts the Indian government's strategy to reduce reliance on thermal coal imports, particularly as Adani plans to import coal from Australia and transport it 700km inland to a plant located in Jharkhand, India's largest coal-producing state.
- State-owned financial institutions in India are backing the project despite existing burdens of non-performing loans to coal projects; the Power Finance Corporation (PFC) has lent Rs. 10,000 crore (US$1.3bn) for Godda, and the State Bank of India (SBI) is reportedly lending Rs. 5,000 crore (US$674m) for the Carmichael project.
- Bangladesh is facing significant power overcapacity, with overall power system utilisation declining to 40% in FY2020, and capacity payments for idle plants reaching Tk90bn (US$1.1bn) in FY2019.
- The Bangladesh government is reportedly planning to cancel its entire pipeline of coal power plants that have not yet started construction, potentially including 13 plants, as it shifts toward LNG and renewable energy.
Cite the original document
- APA
- Nicholas, S. (2020). Adani’s Godda power project left behind by changing energy policy in India and Bangladesh. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ieefa-adanis-godda-power-project-left-behind-changing-energy-policy-india-and-bangladesh
- Chicago
- Nicholas, Simon. Adani’s Godda power project left behind by changing energy policy in India and Bangladesh. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/resources/ieefa-adanis-godda-power-project-left-behind-changing-energy-policy-india-and-bangladesh.
- Wikipedia
- {{cite press release |last1=Nicholas |first1=Simon |title=Adani’s Godda power project left behind by changing energy policy in India and Bangladesh |publisher=Institute for Energy Economics and Financial Analysis |date=25 November 2020 |url=https://ieefa.org/resources/ieefa-adanis-godda-power-project-left-behind-changing-energy-policy-india-and-bangladesh |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000456)}}
- BibTeX
- @misc{nicholas2020adanis, author = {Nicholas, Simon}, title = {{Adani’s Godda power project left behind by changing energy policy in India and Bangladesh}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = nov, url = {https://ieefa.org/resources/ieefa-adanis-godda-power-project-left-behind-changing-energy-policy-india-and-bangladesh}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000456} }
Full text
Collected · Record updated