Japan-funded Matarbari coal plant, Bangladesh costs 8-10 times more than comparable plants

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Matarbari coal plant in Bangladesh is projected to be eight to ten times more expensive per MW of capacity than comparable plants in China, raising concerns about its financial viability and stranded asset risks.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Matarbari coal plant's cost per MW of capacity is approximately US$5 million, which is eight to ten times higher than the US$488,000 to US$657,000 range seen in four similar-sized plants in China.
  • The cost for two 600MW units at Matarbari was initially Tk360 bn (US$4.2 bn) according to the 2014 and 2015 government budgets, but was revised upwards to Tk510.7 bn (US$6 bn) in November 2021.
  • The Matarbari project's operational date has been delayed from 2024 to December 2026, and the project's viability is threatened by rising coal and LNG prices resulting from the Russia-Ukraine conflict.
  • While the high cost of Matarbari Phase 1 was partially justified by its dedicated port and coal handling facilities intended to serve Phase 2, the withdrawal of Sumitomo Corporation from Phase 2 in March 2022 makes the future of this supporting infrastructure doubtful.

Cite the original document

APA
Peh, G. (2022). Japan-funded Matarbari coal plant, Bangladesh costs 8-10 times more than comparable plants. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/japan-funded-matarbari-coal-plant-bangladesh-costs-8-10-times-more-comparable-plants
Chicago
Peh, Ghee. Japan-funded Matarbari coal plant, Bangladesh costs 8-10 times more than comparable plants. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/resources/japan-funded-matarbari-coal-plant-bangladesh-costs-8-10-times-more-comparable-plants.
Wikipedia
{{cite report |last1=Peh |first1=Ghee |title=Japan-funded Matarbari coal plant, Bangladesh costs 8-10 times more than comparable plants |publisher=Institute for Energy Economics and Financial Analysis |date=1 June 2022 |url=https://ieefa.org/resources/japan-funded-matarbari-coal-plant-bangladesh-costs-8-10-times-more-comparable-plants |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000430)}}
BibTeX
@techreport{peh2022japanfunded, author = {Peh, Ghee}, title = {{Japan-funded Matarbari coal plant, Bangladesh costs 8-10 times more than comparable plants}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = jun, url = {https://ieefa.org/resources/japan-funded-matarbari-coal-plant-bangladesh-costs-8-10-times-more-comparable-plants}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000430} }

Full text

Collected · Record updated