An IEEFA analysis finds that U.S. Department of Energy emergency orders to keep aging coal plants open have cost ratepayers at least $300 million through mid-May 2026, while providing negligible benefit to the coal industry.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Between June 2025 and mid-May 2026, U.S. ratepayers faced at least $300 million in extra costs due to more than 20 Department of Energy emergency orders issued under section 202(c) of the Federal Power Act to prevent the retirement of uneconomic coal and oil units. These costs are increasing by more than $30 million per month.
  • The emergency orders have had minimal impact on the coal industry; the 3.03 million tons of coal used by plants under these orders between June 2025 and March 2026 represents less than 1% (specifically 0.86%) of the 350 million tons of coal used for U.S. electricity production in that period. Furthermore, 93% of that coal was used at a single plant, J.H. Campbell in Michigan.
  • Many plants kept open by the orders are unreliable or inoperable, leading to high fixed costs without actual power generation. For example, the Centralia plant in Washington incurred $33.1 million in costs through mid-May despite not running since December, and the F.B. Culley plant in Indiana was available to run for only five of the first 48 days under its December 2025 order.
  • The emergency orders disrupt long-term utility planning and force expensive repairs on aging units that are unlikely to operate once the orders expire, resulting in high short-term costs with little long-term benefit.

Cite the original document

APA
Feaster, S. (2026). Cost of coal plant emergency orders already more than $300 million. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/cost-coal-plant-emergency-orders-already-more-300-million
Chicago
Feaster, Seth. Cost of coal plant emergency orders already more than $300 million. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/resources/cost-coal-plant-emergency-orders-already-more-300-million.
Wikipedia
{{cite report |last1=Feaster |first1=Seth |title=Cost of coal plant emergency orders already more than $300 million |publisher=Institute for Energy Economics and Financial Analysis |date=10 June 2026 |url=https://ieefa.org/resources/cost-coal-plant-emergency-orders-already-more-300-million |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000250)}}
BibTeX
@techreport{feaster2026cost, author = {Feaster, Seth}, title = {{Cost of coal plant emergency orders already more than \$300 million}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = jun, url = {https://ieefa.org/resources/cost-coal-plant-emergency-orders-already-more-300-million}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000250} }

Full text

Collected · Record updated