Indonesia’s electricity planning framework needs single, transparent benchmark
Summary
The report finds that Indonesia's electricity utility, PLN, operates under conflicting benchmarks between the RUPTL and performance contracts, which obscures implementation progress and hinders the mobilization of the USD 73 billion needed for the government's 100GWp solar program.
Key insights
- Indonesia's national electricity utility, PT Perusahaan Listrik Negara (PLN), uses conflicting benchmarks for infrastructure delivery: the public Electricity Supply Business Plan (RUPTL) and a separate performance contract with the Ministry of Energy and Mineral Resources (MEMR). For 2025, the RUPTL projected USD 14.3 billion in investment while the MEMR contract targeted USD 3.1 billion; consequently, PLN's realized investment of USD 4.63 billion represents 149% of the MEMR target but only 32% of the RUPTL projection.
- The government's 100-gigawatt-peak (GWp) solar program, launched in August 2026 with a completion target of 2029, requires a massive scale-up from the 1.5GWp installed in early 2026. This program is estimated to cost USD 73 billion over three years (averaging USD 24 billion per year), which is approximately 15 times the USD 1.59 billion in realized generation investment by PLN, independent power producers, and other utilities in 2025.
- The RUPTL 2025–2034 identifies a critical interdependence between generation and transmission, such as the need for 4,012 kilometers of new 275kV backbone transmission lines to evacuate 5.7GW of hydropower potential in central Sulawesi. Without a credible transmission schedule, generation targets may not represent complete investment opportunities.
- The Sumatra-Java interconnection project demonstrates the volatility of planning; originally announced in 2012 for 2017 completion, it was removed from the 2021–2030 RUPTL due to lower demand and the cancellation of a JICA loan, only to be reintroduced in the 2025–2034 RUPTL as part of the Green Enabling Super Grid with a 2031 target.
Cite the original document
- APA
- Bachtiar, R. (2026). Indonesia’s electricity planning framework needs single, transparent benchmark. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/indonesias-electricity-planning-framework-needs-single-transparent-benchmark
- Chicago
- Bachtiar, Randi. Indonesia’s electricity planning framework needs single, transparent benchmark. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/resources/indonesias-electricity-planning-framework-needs-single-transparent-benchmark.
- Wikipedia
- {{cite report |last1=Bachtiar |first1=Randi |title=Indonesia’s electricity planning framework needs single, transparent benchmark |publisher=Institute for Energy Economics and Financial Analysis |date=1 October 2026 |url=https://ieefa.org/resources/indonesias-electricity-planning-framework-needs-single-transparent-benchmark |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000242)}}
- BibTeX
- @techreport{bachtiar2026indonesias, author = {Bachtiar, Randi}, title = {{Indonesia’s electricity planning framework needs single, transparent benchmark}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = oct, url = {https://ieefa.org/resources/indonesias-electricity-planning-framework-needs-single-transparent-benchmark}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000242} }
Full text
Collected · Record updated