Consumers may pay too high price for virtual LNG pipelines in Pakistan
Summary
The document finds that virtual LNG in Pakistan is likely to be unaffordable for most consumers, with estimated end-user prices between US$17/MMBTU and US$19/MMBTU.
Key insights
- IEEFA estimates that the end-consumer price for LNG delivered via trucks or tanks in Pakistan would range from US$17/MMBTU to US$19/MMBTU.
- Two major VLNG projects are planned with a combined capacity of 6.23 mtpa: a consortium involving CNCEC and LNGFlex (Tabeer LNG) with a peak capacity of 5.23 mtpa, and a project by LNG Easy targeting off-grid consumers with an initial import goal of 1 mtpa.
- There is a significant risk of a supply-demand mismatch, as the combined VLNG capacity (6.23 mtpa) exceeds the total annual natural gas consumption of the cement and industrial sectors (4.7 mtons), potentially leading to idle infrastructure.
- Industrial consumers may find VLNG unaffordable because current industrial gas supply prices range from US$7.7 to US$9.9/mmbtu, which is far below the estimated US$17-19/mmbtu for trucked LNG.
- Pakistan's high credit risk and reliance on oil-indexed long-term contracts may force the country to continue paying higher prices for LNG even when global market prices drop post-2025.
- The transition to VLNG could negatively impact the financial stability of state-owned gas utilities SNGPL and SSGC by diverting high-paying industrial customers.
- Safety concerns exist regarding the transportation of LNG via rail and the requirement for stringent health and safety protocols at consumer-end regasification facilities due to cryogenic temperatures (-162°C).
Cite the original document
- APA
- Isaad, H. (2024). Consumers may pay too high price for virtual LNG pipelines in Pakistan. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/consumers-may-pay-too-high-price-virtual-lng-pipelines-pakistan
- Chicago
- Isaad, Haneea. Consumers may pay too high price for virtual LNG pipelines in Pakistan. Institute for Energy Economics and Financial Analysis, 2024. https://ieefa.org/resources/consumers-may-pay-too-high-price-virtual-lng-pipelines-pakistan.
- Wikipedia
- {{cite report |last1=Isaad |first1=Haneea |title=Consumers may pay too high price for virtual LNG pipelines in Pakistan |publisher=Institute for Energy Economics and Financial Analysis |date=21 March 2024 |url=https://ieefa.org/resources/consumers-may-pay-too-high-price-virtual-lng-pipelines-pakistan |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000233)}}
- BibTeX
- @techreport{isaad2024consumers, author = {Isaad, Haneea}, title = {{Consumers may pay too high price for virtual LNG pipelines in Pakistan}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = mar, url = {https://ieefa.org/resources/consumers-may-pay-too-high-price-virtual-lng-pipelines-pakistan}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000233} }
Full text
Collected · Record updated