SUBMISSIONS ON ARCELORMITTAL VANDERBIJLPARK WORKS’ APPLICATION FOR A POSTPONEMENT AND ALTERNATIVE PLANT STANDARDS OF THE LISTED ACTIVITIES AND ASSOCIATED MINIMUM EMISSION STANDARDS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Vaal Environmental Justice Alliance (VEJA) and groundWork argue that ArcelorMittal South Africa's (AMSA) request for alternative emission standards and postponements at its Vanderbijlpark Works is unlawful and should be denied. They contend that the facility is located in a non-compliant air quality priority area, the proposed standards for hydrogen sulfide and sulfur dioxide are significantly less protective than legal requirements, and the application lacks sufficient technical justification and health risk assessments.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • AMSA is seeking alternative emission standards for hydrogen sulfide (H2S) and sulfur dioxide (SO2), as well as postponements for sulfur recovery and hydrochloric acid (HCl) emissions. The proposed H2S standard of 150 mg/Nm3 is approximately 15 times higher than the existing plant standard (10mg/Nm3) and 20 times higher than the new plant standard (7mg/Nm3). The proposed SO2 standard of 1700 mg/Nm3 is over three times less protective than the required new plant standard.
  • The applicants argue that AMSA's request for postponements should be denied because the Vanderbijlpark Works is located within the Vaal Triangle Airshed Priority Area (VTAPA), where ambient air quality does not comply with National Ambient Air Quality Standards (NAAQS). Under the 2017 National Framework, postponements are prohibited unless ambient air quality in the area is in compliance.
  • The submission claims AMSA failed to meet the three statutory requirements for alternative new plant standards under Section 12A of the List of Activities regulation: it is non-compliant with multiple other emission standards, it provided insufficient evidence of previous emission reductions or direct investments, and it failed to prove material compliance with ambient air quality standards or conduct a health risk assessment for H2S.
  • The Atmospheric Impact Report (AIR) provided by AMSA is described as grossly deficient. Specific criticisms include reporting maximum pollutant concentrations only at the site boundary rather than the maximum overall concentration, using non-representative monitoring results from a single station (Sebokeng) for SO2, and failing to model health risks associated with the proposed H2S increase.
  • The applicants assert that AMSA is not a "fit and proper person" to hold an Atmospheric Emission License (AEL) due to repeated non-compliance with the Air Quality Act (AQA) and other legislation, which should preclude it from receiving postponements or alternative standards.

Cite the original document

APA
groundWork (2019). SUBMISSIONS ON ARCELORMITTAL VANDERBIJLPARK WORKS’ APPLICATION FOR A POSTPONEMENT AND ALTERNATIVE PLANT STANDARDS OF THE LISTED ACTIVITIES AND ASSOCIATED MINIMUM EMISSION STANDARDS. https://groundwork.org.za/wp-content/uploads/2022/07/submission_11_Mar_2019.pdf
Chicago
groundWork. SUBMISSIONS ON ARCELORMITTAL VANDERBIJLPARK WORKS’ APPLICATION FOR A POSTPONEMENT AND ALTERNATIVE PLANT STANDARDS OF THE LISTED ACTIVITIES AND ASSOCIATED MINIMUM EMISSION STANDARDS. 2019. https://groundwork.org.za/wp-content/uploads/2022/07/submission_11_Mar_2019.pdf.
Wikipedia
{{cite press release |author=groundWork |title=SUBMISSIONS ON ARCELORMITTAL VANDERBIJLPARK WORKS’ APPLICATION FOR A POSTPONEMENT AND ALTERNATIVE PLANT STANDARDS OF THE LISTED ACTIVITIES AND ASSOCIATED MINIMUM EMISSION STANDARDS |date=11 March 2019 |url=https://groundwork.org.za/wp-content/uploads/2022/07/submission_11_Mar_2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gwza-000154)}}
BibTeX
@misc{groundwork2019submissions, author = {{groundWork}}, title = {{SUBMISSIONS ON ARCELORMITTAL VANDERBIJLPARK WORKS’ APPLICATION FOR A POSTPONEMENT AND ALTERNATIVE PLANT STANDARDS OF THE LISTED ACTIVITIES AND ASSOCIATED MINIMUM EMISSION STANDARDS}}, publisher = {groundWork}, year = {2019}, month = mar, url = {https://groundwork.org.za/wp-content/uploads/2022/07/submission_11_Mar_2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gwza-000154} }

Full text

Collected · Record updated