COMMENT ON THE PROPOSED CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY OF 3000 MW FROM GAS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A joint submission by environmental organisations argues that the proposed 3000 MW gas-to-power determination is a 'tailor-made' project for Eskom that lacks a rational basis and threatens South Africa's climate commitments and constitutional rights.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The draft gas determination appears to be 'tailor-made and retro-fitted' to facilitate a specific 3,000 MW combined cycle power plant project by Eskom in Richards Bay, rather than being based on a comprehensive assessment of national electricity needs.
  • The public consultation process conducted by NERSA is deemed inadequate due to contradictory deadlines, insufficient time for review (16 working days), and a failure to provide notices in isiZulu, the most common language in the affected Richards Bay area.
  • The proposed 3000 MW gas capacity falls outside the Integrated Resource Plan (IRP) 2019 and would likely result in emissions exceeding 2.5 million tonnes of CO2e annually if running at 75% capacity.
  • Gas-to-power is argued to be an uneconomic investment that risks becoming a stranded asset, as renewable energy and storage are now more cost-competitive and the project would be commissioned up to a decade before it is economically optimal.
  • The document asserts that the 'baseload' argument used to justify gas plants is outdated, as variable renewable energy supplemented by flexible dispatchable generators can maintain reliable supply more cost-effectively.
  • The draft determination is legally defective because it fails to specify a buyer and does not clearly state whether the capacity will be established by Eskom or an Independent Power Producer (IPP), violating the New Generation Regulations.
  • Methane leaks during the production and transport of natural gas make it as emission-intensive as coal, if not more so, particularly when evaluated over a 20-year timeframe.
  • The proposed plant would require significant water use, between 2000 and 5000 cubic metres per day, which is problematic given the Richards Bay area's vulnerability to warming and droughts.

Cite the original document

APA
groundWork (2022). COMMENT ON THE PROPOSED CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY OF 3000 MW FROM GAS. https://groundwork.org.za/wp-content/uploads/2022/09/Joint-Submission-on-the-s34-Determination_vf-as-submitted.pdf
Chicago
groundWork. COMMENT ON THE PROPOSED CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY OF 3000 MW FROM GAS. 2022. https://groundwork.org.za/wp-content/uploads/2022/09/Joint-Submission-on-the-s34-Determination_vf-as-submitted.pdf.
Wikipedia
{{cite press release |author=groundWork |title=COMMENT ON THE PROPOSED CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY OF 3000 MW FROM GAS |date=16 September 2022 |url=https://groundwork.org.za/wp-content/uploads/2022/09/Joint-Submission-on-the-s34-Determination_vf-as-submitted.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gwza-000119)}}
BibTeX
@misc{groundwork2022comment, author = {{groundWork}}, title = {{COMMENT ON THE PROPOSED CONCURRENCE WITH THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY OF 3000 MW FROM GAS}}, publisher = {groundWork}, year = {2022}, month = sep, url = {https://groundwork.org.za/wp-content/uploads/2022/09/Joint-Submission-on-the-s34-Determination_vf-as-submitted.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gwza-000119} }

Full text

Collected · Record updated