Integrated Resource Plan for Electricity (‘IRP’) – Request for reasonable opportunity to comment on revised draft IRP prior to submission to Cabinet for approval
Summary
The Green Connection and partners argue that the draft IRP2024 was not released for public comment despite containing material changes from previous versions, including new allocations for gas and nuclear power. They contend that approving the plan without further consultation would violate the principle of procedural rationality and the rule of law.
Key insights
- The draft IRP2024 differs materially from the draft IRP2023 that was published for public comment, specifically by introducing a 'Proposed Balanced Plan' for the period 2024 to 2050.
- The draft IRP2024 proposes new electricity generation capacity allocations of 18,250MW for gas-to-power and 5,200MW for nuclear electricity generation.
- The authors argue that the draft IRP2024 risks creating stranded assets and lacks the guidance of an Integrated Energy Plan (IEP), which was only expected to be concluded by September 2024.
- Previous submissions on the draft IRP2023 asserted that the plan failed to ensure a reliable electricity delivery system at least cost and would exacerbate energy poverty by ignoring the costs of externalities in a fossil fuel-heavy mix.
- The authors contend that the current public consultation process for the IRP revision fails the requirement of procedural rationality and that any decision to approve the draft IRP2024 would be vulnerable to legal challenge under the principle of legality.
Cite the original document
- APA
- Pole, A. L. (2025). Integrated Resource Plan for Electricity (‘IRP’) – Request for reasonable opportunity to comment on revised draft IRP prior to submission to Cabinet for approval. The Green Connection. https://stage.thegreenconnection.org.za/wp-content/uploads/2025/06/Letter-to-Minister-of-Electricity-and-Energy-Integrated-Resource-Plan-19-June-2025.pdf
- Chicago
- Pole, Adrian Leonard. Integrated Resource Plan for Electricity (‘IRP’) – Request for reasonable opportunity to comment on revised draft IRP prior to submission to Cabinet for approval. The Green Connection, 2025. https://stage.thegreenconnection.org.za/wp-content/uploads/2025/06/Letter-to-Minister-of-Electricity-and-Energy-Integrated-Resource-Plan-19-June-2025.pdf.
- Wikipedia
- {{cite press release |last1=Pole |first1=Adrian Leonard |title=Integrated Resource Plan for Electricity (‘IRP’) – Request for reasonable opportunity to comment on revised draft IRP prior to submission to Cabinet for approval |publisher=The Green Connection |date=19 June 2025 |url=https://stage.thegreenconnection.org.za/wp-content/uploads/2025/06/Letter-to-Minister-of-Electricity-and-Energy-Integrated-Resource-Plan-19-June-2025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document greencon-000015)}}
- BibTeX
- @misc{pole2025integrated, author = {Pole, Adrian Leonard}, title = {{Integrated Resource Plan for Electricity (‘IRP’) – Request for reasonable opportunity to comment on revised draft IRP prior to submission to Cabinet for approval}}, publisher = {The Green Connection}, year = {2025}, month = jun, url = {https://stage.thegreenconnection.org.za/wp-content/uploads/2025/06/Letter-to-Minister-of-Electricity-and-Energy-Integrated-Resource-Plan-19-June-2025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document greencon-000015} }
Full text
Collected · Record updated