EXPERT CRITIQUE OF CLIMATE CHANGE IMPACT ASSESSMENT FROM TEEPSA’s OFFSHORE PRODUCTION RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATIONS FOR BLOCK 11B/12B, SOUTHERN CAPE COAST, SOUTH AFRICA
Summary
The report concludes that TEEPSA's Climate Change Impact Assessment is fundamentally flawed and significantly underestimates greenhouse gas emissions by omitting key sources and using outdated scientific assumptions.
Key insights
- The CCIA's estimate of 1.5 MtCO2e emissions over a 27-year lifespan is a significant underestimate because it omits critical sources, including the end use of gas and gas condensate, leakage and venting from infrastructure, flaring at well platforms, and emissions from the refurbished F-A platform processing facility.
- The CCIA uses outdated 2007 IPCC AR4 Global Warming Potential (GWP) values for methane (25) instead of the 2021 AR6 consensus (29.8), which would increase the reported methane emissions by 19%.
- The CCIA assumes an unrealistically high natural gas processing flaring efficiency of 98%, whereas peer-reviewed research on US natural gas wells shows efficiencies between 90.2% and 91.8%.
- The CCIA incorrectly categorizes emissions from the F-A platform as Scope 3 (indirect) rather than Scope 1 (direct), which removes over 4 megatonnes of CO2e from the project's total direct climate impact significance.
- The CCIA fails to calculate emissions based on the maximum likely number of production wells (6), instead basing calculations on 5 wells despite the option to drill a sixth without further environmental studies.
- The CCIA's cumulative impact assessment is insufficient because it only considers projects in 'reasonable proximity' to Block 11B/12B, ignoring the global nature of greenhouse gases and other oil and gas projects in South African waters.
- The mitigation measures proposed by the CCIA are described as vague and unproven, lacking quantification of how they would actually reduce emissions or a clear pathway from the action to the reduction.
Cite the original document
- APA
- Marais, E. A. (n.d.). EXPERT CRITIQUE OF CLIMATE CHANGE IMPACT ASSESSMENT FROM TEEPSA’s OFFSHORE PRODUCTION RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATIONS FOR BLOCK 11B/12B, SOUTHERN CAPE COAST, SOUTH AFRICA. The Green Connection. https://stage.thegreenconnection.org.za/wp-content/uploads/2023/11/B.-TEEPSA-11B-12B-Draft-EIA-Expert-Climate-Rpt-Marais_Final.pdf
- Chicago
- Marais, Eloise A. EXPERT CRITIQUE OF CLIMATE CHANGE IMPACT ASSESSMENT FROM TEEPSA’s OFFSHORE PRODUCTION RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATIONS FOR BLOCK 11B/12B, SOUTHERN CAPE COAST, SOUTH AFRICA. The Green Connection, n.d. https://stage.thegreenconnection.org.za/wp-content/uploads/2023/11/B.-TEEPSA-11B-12B-Draft-EIA-Expert-Climate-Rpt-Marais_Final.pdf.
- Wikipedia
- {{cite report |last1=Marais |first1=Eloise A. |title=EXPERT CRITIQUE OF CLIMATE CHANGE IMPACT ASSESSMENT FROM TEEPSA’s OFFSHORE PRODUCTION RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATIONS FOR BLOCK 11B/12B, SOUTHERN CAPE COAST, SOUTH AFRICA |publisher=The Green Connection |url=https://stage.thegreenconnection.org.za/wp-content/uploads/2023/11/B.-TEEPSA-11B-12B-Draft-EIA-Expert-Climate-Rpt-Marais_Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document greencon-000009)}}
- BibTeX
- @techreport{maraisndexpert, author = {Marais, Eloise A.}, title = {{EXPERT CRITIQUE OF CLIMATE CHANGE IMPACT ASSESSMENT FROM TEEPSA’s OFFSHORE PRODUCTION RIGHT AND ENVIRONMENTAL AUTHORISATION APPLICATIONS FOR BLOCK 11B/12B, SOUTHERN CAPE COAST, SOUTH AFRICA}}, institution = {The Green Connection}, url = {https://stage.thegreenconnection.org.za/wp-content/uploads/2023/11/B.-TEEPSA-11B-12B-Draft-EIA-Expert-Climate-Rpt-Marais_Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document greencon-000009} }
Full text
Collected · Record updated