Pre-Feasibility Assessment on Electric Buses in Siem Reap, Cambodia

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report recommends the deployment of 12-meter battery-powered electric buses (BEB) with plug charging for three proposed routes in Siem Reap. While requiring higher initial capital expenditure than diesel buses, the BEB option is found to be financially and economically more attractive over its lifespan due to significant operational savings. The study also proposes a phased implementation of smart transport systems to address traffic congestion and poor information services.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The study recommends 12-meter-long battery-powered electric buses (BEB) with a plug charging system as the optimal technology for the three proposed lines in Siem Reap, citing low traffic demand (less than 200 km daily distance driven) and lower infrastructure costs.
  • Introducing a fleet of BEBs is projected to reduce annual carbon dioxide (CO2) emissions, including black carbon, by 43%, and eliminate 100% of Particulate Matter (PM2.5) and Nitrogen Oxides (NOx) emissions compared to a diesel baseline.
  • Financial analysis indicates that the BEB option is more attractive over its lifespan than diesel vehicles, with a positive financial net present value (FNPV) of approximately USD 2 million in total cost savings and a financial internal rate of return (FIRR) of 17%.
  • The economic assessment shows a net economic benefit (ENPV) of approximately USD 3.3 million and an economic internal rate of return (EIRR) of 20%, exceeding the social discount rate of 9%.
  • Traffic volume surveys from February 2021 identified Line 1 as the busiest route with approximately 47,000 units on weekdays, while motorcycles were the dominant mode of transport across all lines, accounting for 76.4% of all observed vehicles.
  • A satisfaction survey of 240 citizens revealed that the primary transport problems in Siem Reap are frequent congestion at intersections, congestion on roadways, and a lack of parking spaces.
  • The report proposes a two-phase deployment of Intelligent Transport Systems (ITS): Phase 1 includes an Advanced Traffic Management System (ATMS), Bus Information System (BIS), and Bus Management System (BMS); Phase 2 includes an Illegal Parking Enforcement System (IPES) and Parking Management System (PMS).
  • The enabling environment for e-buses in Siem Reap is currently assessed as weak across most factors, including the absence of a public transport system, a lack of specific transport emission targets in the revised NDC, and a grid carbon factor (0.7kgCO2e/kWh) that is above the Asian median.
  • Key project risks include negative impacts on local tuk-tuk drivers' livelihoods, a lack of institutional and technical capacity for e-bus operation, and the environmental impact of used battery waste.
  • To manage high upfront capital costs, the report suggests a leasing scheme for buses or batteries, allowing the authority to use operational expenditure (OPEX) savings to make long-term payments.

Cite the original document

APA
Global Green Growth Institute (2023). Pre-Feasibility Assessment on Electric Buses in Siem Reap, Cambodia. https://gggi.org/wp-content/uploads/2023/07/Pre-Feasibility-Assessment-on-Electric-Buses-in-Siem-Reap-July-2023-1.pdf
Chicago
Global Green Growth Institute. Pre-Feasibility Assessment on Electric Buses in Siem Reap, Cambodia. 2023. https://gggi.org/wp-content/uploads/2023/07/Pre-Feasibility-Assessment-on-Electric-Buses-in-Siem-Reap-July-2023-1.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Pre-Feasibility Assessment on Electric Buses in Siem Reap, Cambodia |date=2023 |url=https://gggi.org/wp-content/uploads/2023/07/Pre-Feasibility-Assessment-on-Electric-Buses-in-Siem-Reap-July-2023-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000709)}}
BibTeX
@techreport{globalgreengrowthinstitute2023prefeasibility, author = {{Global Green Growth Institute}}, title = {{Pre-Feasibility Assessment on Electric Buses in Siem Reap, Cambodia}}, institution = {Global Green Growth Institute}, year = {2023}, url = {https://gggi.org/wp-content/uploads/2023/07/Pre-Feasibility-Assessment-on-Electric-Buses-in-Siem-Reap-July-2023-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000709} }

Full text

Collected · Record updated