GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025
Summary
The report finds that the New Kigali International Airport can achieve Zero Energy status by installing a 21 MWp solar photovoltaic system, which would mitigate 19,680 tonnes of CO2 equivalent annually.
Key insights
- The current air-cooled chiller system for NKIA, with a Coefficient of Performance (COP) of 3.16, does not meet the Rwanda Green Building Minimum Compliance System or the Green Mark 4.1 certification requirements, which require a minimum design system efficiency of 4.39 COP.
- Upgrading to a high-efficiency water-cooled chiller system with a COP of 7.03 is estimated to save 2,497 MWh annually and reduce emissions by 1,299 tCO2e per year, with an investment cost of USD 5.28 million and a payback period of 8.59 years.
- Transitioning from R-134A refrigerant (GWP 1,530) to low-GWP alternatives such as R-1234yf (GWP 0.501) would reduce Scope 1 fugitive emissions by approximately 1,790 tCO2e.
- NKIA can achieve Zero Energy status by implementing an on-site 21 MWp solar photovoltaic (PV) system capable of generating 37,846 MWh annually, which exceeds the estimated building consumption of 36,043 MWh per year.
- The solar PV system installation is estimated to cost USD 19.75 million and deliver annual savings of USD 9.3 million, resulting in a return on investment of 2.12 years.
- Climate modelling indicates that a 1°C increase in outdoor temperature would increase the building cooling load by 24.90%, and a 2°C increase would raise it by 37.22%, requiring the cooling capacity to be increased to at least 12,500 kW.
- Proposed adaptation measures include improving building insulation to target U-values of <1.5 w/m2 for walls and <0.8 w/m2 for roofs, which could save up to 10% of cooling demand.
Cite the original document
- APA
- Global Green Growth Institute (2025). GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025. https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf
- Chicago
- Global Green Growth Institute. GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025. 2025. https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf.
- Wikipedia
- {{cite report |author=Global Green Growth Institute |title=GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025 |date=2025 |url=https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000569)}}
- BibTeX
- @techreport{globalgreengrowthinstitute2025greening, author = {{Global Green Growth Institute}}, title = {{GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025}}, institution = {Global Green Growth Institute}, year = {2025}, url = {https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000569} }
Full text
Collected · Record updated