GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that the New Kigali International Airport can achieve Zero Energy status by installing a 21 MWp solar photovoltaic system, which would mitigate 19,680 tonnes of CO2 equivalent annually.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The current air-cooled chiller system for NKIA, with a Coefficient of Performance (COP) of 3.16, does not meet the Rwanda Green Building Minimum Compliance System or the Green Mark 4.1 certification requirements, which require a minimum design system efficiency of 4.39 COP.
  • Upgrading to a high-efficiency water-cooled chiller system with a COP of 7.03 is estimated to save 2,497 MWh annually and reduce emissions by 1,299 tCO2e per year, with an investment cost of USD 5.28 million and a payback period of 8.59 years.
  • Transitioning from R-134A refrigerant (GWP 1,530) to low-GWP alternatives such as R-1234yf (GWP 0.501) would reduce Scope 1 fugitive emissions by approximately 1,790 tCO2e.
  • NKIA can achieve Zero Energy status by implementing an on-site 21 MWp solar photovoltaic (PV) system capable of generating 37,846 MWh annually, which exceeds the estimated building consumption of 36,043 MWh per year.
  • The solar PV system installation is estimated to cost USD 19.75 million and deliver annual savings of USD 9.3 million, resulting in a return on investment of 2.12 years.
  • Climate modelling indicates that a 1°C increase in outdoor temperature would increase the building cooling load by 24.90%, and a 2°C increase would raise it by 37.22%, requiring the cooling capacity to be increased to at least 12,500 kW.
  • Proposed adaptation measures include improving building insulation to target U-values of <1.5 w/m2 for walls and <0.8 w/m2 for roofs, which could save up to 10% of cooling demand.

Cite the original document

APA
Global Green Growth Institute (2025). GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025. https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf
Chicago
Global Green Growth Institute. GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025. 2025. https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025 |date=2025 |url=https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000569)}}
BibTeX
@techreport{globalgreengrowthinstitute2025greening, author = {{Global Green Growth Institute}}, title = {{GREENING THE NEW KIGALI INTERNATIONAL AIRPORT 2025}}, institution = {Global Green Growth Institute}, year = {2025}, url = {https://gggi.org/wp-content/uploads/2026/02/Greening-the-New-Kigali-International-Airport.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000569} }

Full text

Collected · Record updated