Feasibility Study on Potential Routes, E-Buses, and Charging Infrastructure for Pilot Project in Bali, Indonesia

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The study identifies the Trans Sarbagita 1 route as the most viable for electrification and recommends the deployment of 10 minibuses under 10 meters and five 100 kW ultra-fast chargers to optimize service and accessibility in Bali.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Trans Sarbagita 1 (TS1) route, connecting GOR Ngurah Rai and Bali State Polytechnic (PNB), was selected as the most suitable pilot route due to high ridership potential from students and tourists, strong network connectivity, and low capital investment requirements.
  • The study recommends procuring minibuses under 10 meters in length from a single manufacturer to accommodate Bali's narrow streets and simplify maintenance and depot layout.
  • The proposed charging infrastructure includes two 100 kW ultra-fast chargers at the Bali Provincial Transportation Agency depot for overnight charging and three 100 kW ultra-fast chargers at the GOR Ngurah Rai layover point for en-route charging.
  • Transitioning the TS1 route to electric propulsion is projected to reduce carbon dioxide emissions by approximately 80 tCO2 per year, with a projected annual cost-benefit of $2,937 if 5 diesel buses are replaced by 5 e-buses.
  • The Bali Provincial Government selected Scenario 5, which implements a 30-minute headway with 20-minute intervals during peak hours, requiring a total first-year expenditure (CAPEX and OPEX) estimated at Rp 4.86 billion.
  • Six feeder lines are proposed to expand coverage to underserved densely populated areas and connect the TS1 corridor to the Garuda Wisnu Kencana Cultural Park.
  • Financial modelling indicates that while e-buses offer lower operational expenditure (OPEX) due to reduced fuel and maintenance costs, the government must establish institutional tools to fund midlife battery replacement and vehicle overhauls.
  • The most critical risks identified are flooding at the depot, the high cost of battery replacement, and traffic congestion that could disrupt service frequency and en-route charging times.
  • To mitigate flooding risks at the Bali Provincial Transportation Agency office compound, the study recommends constructing elevated ramps and improving drainage.
  • The study suggests that commercializing the charging stations at GOR Ngurah Rai for other electric vehicles could generate a potential revenue stream with an NPV of Rp 522 million over 10 years.

Cite the original document

APA
Global Green Growth Institute (2026). Feasibility Study on Potential Routes, E-Buses, and Charging Infrastructure for Pilot Project in Bali, Indonesia. https://gggi.org/wp-content/uploads/2026/08/Feasibility-Study-on-Potential-Routes-E-Buses-and-Charging-Infrastructure-for-Pilot-Project-in-Bali-Indonesia.pdf
Chicago
Global Green Growth Institute. Feasibility Study on Potential Routes, E-Buses, and Charging Infrastructure for Pilot Project in Bali, Indonesia. 2026. https://gggi.org/wp-content/uploads/2026/08/Feasibility-Study-on-Potential-Routes-E-Buses-and-Charging-Infrastructure-for-Pilot-Project-in-Bali-Indonesia.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Feasibility Study on Potential Routes, E-Buses, and Charging Infrastructure for Pilot Project in Bali, Indonesia |date=April 2026 |url=https://gggi.org/wp-content/uploads/2026/08/Feasibility-Study-on-Potential-Routes-E-Buses-and-Charging-Infrastructure-for-Pilot-Project-in-Bali-Indonesia.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000347)}}
BibTeX
@techreport{globalgreengrowthinstitute2026feasibility, author = {{Global Green Growth Institute}}, title = {{Feasibility Study on Potential Routes, E-Buses, and Charging Infrastructure for Pilot Project in Bali, Indonesia}}, institution = {Global Green Growth Institute}, year = {2026}, month = apr, url = {https://gggi.org/wp-content/uploads/2026/08/Feasibility-Study-on-Potential-Routes-E-Buses-and-Charging-Infrastructure-for-Pilot-Project-in-Bali-Indonesia.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000347} }

Full text

Collected · Record updated