Citywide Wastewater Management Plan for Pakse City (2022-2033)

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Citywide Wastewater Management Plan for Pakse City aims to achieve 100% population access to safe sanitation and 50% wastewater treatment by 2033. It proposes a phased investment of USD 28 million to transition from unregulated onsite systems to a public service model using decentralized wastewater treatment systems (DEWATS) and a city-level faecal sludge treatment plant.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Pakse City currently lacks proper wastewater infrastructure, with 100% of generated wastewater flowing into the Mekong or Xedon rivers or seeping into the ground without treatment, leading to public health and groundwater pollution.
  • The city's current sanitation relies on unregulated onsite containment; approximately 60% of properties use septic tanks, but 83% of these have never been emptied.
  • The plan sets two primary targets for 2033: 100% of the population having access to safely managed and affordable sanitation services, and 50% of the city's wastewater being treated to environmental standards before disposal.
  • The proposed strategy employs a hybrid approach: decentralized sewerage systems for flood-prone, dense, and low-lying areas, and scheduled emptying every three years via faecal sludge management for all other areas.
  • The implementation is divided into three phases: Phase 1 (2022-2025) focuses on setting up services and institutional frameworks; Phase 2 (2026-2029) focuses on scaling up infrastructure; and Phase 3 (2030-2033) focuses on performance improvement.
  • The total estimated investment for decentralized sanitation and faecal sludge management systems across the four phases is USD 28 million.
  • To ensure financial sustainability, the city will introduce a city-wide sanitation tariff based on the 'polluter pays principle,' linked to water consumption and managed through a ring-fenced account.
  • The wastewater sector in Lao PDR contributes approximately 4% of the country's total greenhouse gas emissions; the plan aims to reduce these through measures such as co-composting faecal sludge.
  • Approximately 70% of the population in Pakse lives in areas prone to regular flooding, which complicates the design of septic tanks and pit latrines due to a high ground surface water table of 1.5 to 2 meters.

Cite the original document

APA
Global Green Growth Institute (n.d.). Citywide Wastewater Management Plan for Pakse City (2022-2033). https://gggi.org/wp-content/uploads/2024/12/Citywide-Wastewater-Management-Plan-for-Pakse-City-2022-2033.pdf
Chicago
Global Green Growth Institute. Citywide Wastewater Management Plan for Pakse City (2022-2033). n.d. https://gggi.org/wp-content/uploads/2024/12/Citywide-Wastewater-Management-Plan-for-Pakse-City-2022-2033.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Citywide Wastewater Management Plan for Pakse City (2022-2033) |url=https://gggi.org/wp-content/uploads/2024/12/Citywide-Wastewater-Management-Plan-for-Pakse-City-2022-2033.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000256)}}
BibTeX
@techreport{globalgreengrowthinstitutendcitywide, author = {{Global Green Growth Institute}}, title = {{Citywide Wastewater Management Plan for Pakse City (2022-2033)}}, institution = {Global Green Growth Institute}, url = {https://gggi.org/wp-content/uploads/2024/12/Citywide-Wastewater-Management-Plan-for-Pakse-City-2022-2033.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000256} }