Summary
The Implementation Plan for the Nationally Determined Contributions of Lao PDR assesses progress toward climate targets across several sectors. In mitigation, the energy sector is 'On track' or 'Exceeded' for hydropower and renewables, while the AFOLU sector 'Needs attention' due to gaps in achieving a 70% forest cover target. Adaptation efforts are generally 'On track' for public health and urban development, but 'Need attention' in energy and forestry. The plan identifies a total mitigation funding requirement of USD 4.7 billion for conditional targets and outlines specific priority actions, such as scaling up sustainable forest plantations and improving dam safety regulations.
Key insights
- Lao PDR aims to achieve net-zero emissions by 2050 and increase total forest coverage to 70% of the national land area by 2035.
- The conditional climate mitigation target for 2020-2030 is estimated to cost USD 4.7 billion.
- The AFOLU sector's achievement status for both unconditional and conditional mitigation targets is identified as 'Needs attention', particularly regarding the goal of 70% forest cover.
- The energy sector is largely 'On track' for its mitigation targets, with the 13 GW installed capacity of hydropower target assessed as 'Exceeded'.
- Transport sector unconditional targets are on track, but conditional targets—specifically 30% electric vehicle penetration and 10% biofuel use—'Need attention'.
- The waste sector is 'On track' for its conditional target of implementing 500 tons/day sustainable municipal solid waste management in Vientiane Capital.
- Adaptation targets for public health and transport/urban development are generally 'On track', while the energy sector's short-term adaptation target 'Needs attention' because climate change has not been mainstreamed into its strategy.
- The forestry and land-use change sector has made limited progress on long-term adaptation targets, which are currently classified as 'Needs attention'.
- The government has established a governance structure where the Prime Minister Office provides overall management, and the Ministry of Natural Resources and Environment (MONRE) takes direct responsibility for coordination.
Cite the original document
- APA
- Global Green Growth Institute (2024). Implementation Plan for the Nationally Determined Contributions of Lao PDR. https://gggi.org/wp-content/uploads/2024/11/20230423_Lao_PDR_NDC_Implementation_Plan_FINAL_ENG_Signed.pdf
- Chicago
- Global Green Growth Institute. Implementation Plan for the Nationally Determined Contributions of Lao PDR. 2024. https://gggi.org/wp-content/uploads/2024/11/20230423_Lao_PDR_NDC_Implementation_Plan_FINAL_ENG_Signed.pdf.
- Wikipedia
- {{cite report |author=Global Green Growth Institute |title=Implementation Plan for the Nationally Determined Contributions of Lao PDR |date=April 2024 |url=https://gggi.org/wp-content/uploads/2024/11/20230423_Lao_PDR_NDC_Implementation_Plan_FINAL_ENG_Signed.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000149)}}
- BibTeX
- @techreport{globalgreengrowthinstitute2024implementation, author = {{Global Green Growth Institute}}, title = {{Implementation Plan for the Nationally Determined Contributions of Lao PDR}}, institution = {Global Green Growth Institute}, year = {2024}, month = apr, url = {https://gggi.org/wp-content/uploads/2024/11/20230423_Lao_PDR_NDC_Implementation_Plan_FINAL_ENG_Signed.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000149} }
Full text
Collected · Record updated