Infrastructure Pipeline and Need for Robust Project Preparation

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document argues that the primary constraint to infrastructure development in emerging markets is not a lack of funding, but a shortage of properly structured, 'bankable' projects. It identifies critical gaps in project quantity and quality, driven by a lack of technical skills and capacity in both government and private sectors. The paper details the project preparation process—which typically costs 5%–10% of total investment—and evaluates the limitations of existing Project Preparation Facilities (PPFs), particularly in Africa. It concludes with recommendations for new financial institutions to improve pipeline delivery through strategic partnerships, private sector leveraging, and robust portfolio management.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The global infrastructure project pipeline in emerging and developing economies is insufficient in both quantity and quality, with worldwide expenditures needing to more than double by 2020 to meet projected needs.
  • A lack of bankable projects, rather than a lack of available financing, is the primary obstacle to private capital flow. Investors face 'ambiguity' due to inadequate fact bases during preliminary work, which prevents the quantification of risk-return tradeoffs.
  • Project preparation costs in developing countries generally range from 5% to 10% of the total project investment. In Africa, existing PPFs are underfunded; the 17 core facilities have approximately US$190 million in uncommitted funds, while US$525 million is required annually to support the Program for Infrastructure Development in Africa (PIDA) Priority Action Plan (PAP).
  • Infrastructure delivery in several emerging markets is severely hindered by execution delays and backlogs. In India, 42% of 564 projects commissioned between 2003 and 2011 were delayed. In Brazil, 60% of large sanitation projects were delayed, on hold, or not yet initiated by the end of 2011.
  • The root cause of pipeline failures is a systemic shortage of specialized skills—technical, legal, financial, and environmental—across both government and private sector actors, leading to poor planning and inefficient contract management.
  • Political and regulatory instability represents a major risk to infrastructure investment. Specifically, the abrupt removal of subsidies or feed-in tariffs for climate change initiatives can lead to rapid investment slowdowns and significant investor losses.

Cite the original document

APA
Kortekaas, B. (2015). Infrastructure Pipeline and Need for Robust Project Preparation. Global Green Growth Institute. https://gggi.org/wp-content/uploads/2017/11/2015-06-Infrastructure-Pipeline-and-Need-for-Robust-Project-Preparation.pdf
Chicago
Kortekaas, Brendon. Infrastructure Pipeline and Need for Robust Project Preparation. Global Green Growth Institute, 2015. https://gggi.org/wp-content/uploads/2017/11/2015-06-Infrastructure-Pipeline-and-Need-for-Robust-Project-Preparation.pdf.
Wikipedia
{{cite report |last1=Kortekaas |first1=Brendon |title=Infrastructure Pipeline and Need for Robust Project Preparation |publisher=Global Green Growth Institute |date=June 2015 |url=https://gggi.org/wp-content/uploads/2017/11/2015-06-Infrastructure-Pipeline-and-Need-for-Robust-Project-Preparation.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000122)}}
BibTeX
@techreport{kortekaas2015infrastructure, author = {Kortekaas, Brendon}, title = {{Infrastructure Pipeline and Need for Robust Project Preparation}}, institution = {Global Green Growth Institute}, year = {2015}, month = jun, url = {https://gggi.org/wp-content/uploads/2017/11/2015-06-Infrastructure-Pipeline-and-Need-for-Robust-Project-Preparation.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000122} }

Full text

Collected · Record updated