Offener Brief zum LNG-Beschleunigungsgesetz: Beschleunigte Genehmigung von LNG-Terminals nur zur Abwendung einer unmittelbaren Gas-Notlage

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A coalition of environmental organizations urges the German government to amend the LNG Acceleration Act to prevent long-term fossil fuel lock-in and environmental degradation. They argue that the current draft lacks a precise definition of the energy emergency and risks oversupplying the market with natural gas, which would undermine the Federal Climate Change Act and the transition to a green hydrogen economy. The authors demand a rigorous needs assessment, a reduction in the number of approved terminals, a shortening of operational permits from 2043 to 2030, and the restoration of environmental impact assessments for projects not essential for the immediate winter 2022 crisis.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The authors argue that the draft LNG Acceleration Act fails to define the specific energy emergency it aims to address, which could lead to an oversupply of natural gas and jeopardize the Federal Climate Change Act and the transition to green hydrogen.
  • The letter claims that the eleven proposed LNG terminals exceed actual needs, noting that Russian imports already cover only 35% to 40% of German gas demand, and calls for a precise needs plan to reduce the number of projects.
  • The proposed operational permit for LNG terminals until December 31, 2043, is viewed as inconsistent with climate goals; the authors demand this be shortened to December 31, 2030, to align with the necessary ramp-up of green hydrogen imports starting in 2025.
  • The authors oppose the general exemption from environmental impact assessments for all eleven LNG projects, arguing that such exemptions should only apply to floating terminals capable of being operational by winter 2022.

Cite the original document

APA
Germanwatch (2022). Offener Brief zum LNG-Beschleunigungsgesetz: Beschleunigte Genehmigung von LNG-Terminals nur zur Abwendung einer unmittelbaren Gas-Notlage. https://www.germanwatch.org/sites/default/files/offener_brief_zum_lng-beschleunigungsgesetz.pdf
Chicago
Germanwatch. Offener Brief zum LNG-Beschleunigungsgesetz: Beschleunigte Genehmigung von LNG-Terminals nur zur Abwendung einer unmittelbaren Gas-Notlage. 2022. https://www.germanwatch.org/sites/default/files/offener_brief_zum_lng-beschleunigungsgesetz.pdf.
Wikipedia
{{cite press release |author=Germanwatch |title=Offener Brief zum LNG-Beschleunigungsgesetz: Beschleunigte Genehmigung von LNG-Terminals nur zur Abwendung einer unmittelbaren Gas-Notlage |date=13 May 2022 |url=https://www.germanwatch.org/sites/default/files/offener_brief_zum_lng-beschleunigungsgesetz.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-001986)}}
BibTeX
@misc{germanwatch2022offener, author = {{Germanwatch}}, title = {{Offener Brief zum LNG-Beschleunigungsgesetz: Beschleunigte Genehmigung von LNG-Terminals nur zur Abwendung einer unmittelbaren Gas-Notlage}}, publisher = {Germanwatch}, year = {2022}, month = may, url = {https://www.germanwatch.org/sites/default/files/offener_brief_zum_lng-beschleunigungsgesetz.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-001986} }

Full text

Collected · Record updated