The document outlines a framework for inclusive power grid planning, emphasizing the need for early stakeholder engagement to mitigate social conflict during the energy transition. It distinguishes between two planning levels—needs assessment and corridor/route planning—and provides specific recommendations for TSOs and local citizens. Through case studies like SuedLink and NemoLink, it demonstrates how informal dialogue, transparent communication on technology (AC vs. DC), and addressing concerns over electromagnetic fields (EMFs) can improve project legitimacy. It also discusses compensatory measures for affected landowners and environmental mitigation strategies to protect biodiversity, particularly birds.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Power grid planning is generally a two-level process: first, a needs assessment to determine if new lines are required based on future scenarios, followed by corridor and route planning to determine the specific path of the infrastructure.
  • The 'paradox of participation' describes a situation where the window for meaningful influence is greatest at the start of a project when information is vague, but stakeholder interest and engagement typically peak later when decisions are already advanced.
  • Public participation in grid planning typically occurs at the levels of information and consultation, but can be extended to co-decision, particularly during the identification of corridors and routes where local knowledge is valuable.
  • Direct communication tools, such as 'info-markets' used by TenneT and Elia, and mobile info-buses used by 50Hertz, are effective for reaching broader audiences and alleviating fears regarding electromagnetic fields (EMFs) through on-site measurements.
  • While underground cabling is often requested by local communities to reduce visual impact, it is significantly more expensive and technically challenging for extra-high voltage (EHV) alternating current (AC) systems compared to overhead lines.
  • Direct current (DC) technology is more suitable for long-distance transmission and has fewer technical restrictions for underground cabling than AC technology, as seen in the Swedish South West Link project.
  • To reduce social conflict and increase legitimacy, TSOs should implement compensatory measures, including financial payments to landowners and municipalities, and environmental mitigation such as bird protection markers on 'earth wires'.
  • The NemoLink project highlights the added complexity of transnational marine projects, requiring a 'Marine Best Practice Action Plan' to coordinate different legal systems and engage specific stakeholders like the Fishermen Association.

Cite the original document

APA
Germanwatch (n.d.). Recommendations from the BESTGRID Project Handbook. https://www.germanwatch.org/sites/default/files/publication/11062.pdf
Chicago
Germanwatch. Recommendations from the BESTGRID Project Handbook. n.d. https://www.germanwatch.org/sites/default/files/publication/11062.pdf.
Wikipedia
{{cite report |author=Germanwatch |title=Recommendations from the BESTGRID Project Handbook |url=https://www.germanwatch.org/sites/default/files/publication/11062.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-000706)}}
BibTeX
@techreport{germanwatchndrecommendations, author = {{Germanwatch}}, title = {{Recommendations from the BESTGRID Project Handbook}}, institution = {Germanwatch}, url = {https://www.germanwatch.org/sites/default/files/publication/11062.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-000706} }

Full text

Collected · Record updated