Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Dakar Bus Rapid Transit Pilot Project is a public sector initiative in Senegal designed to transition the Greater Dakar Area from a car-oriented city to a resilient, people-oriented one. The project involves the construction of an 18.3km segregated BRT line connecting the Dakar plateau to the northern suburbs, utilizing a fleet of 159 electric articulated buses. With a total indicative cost of USD 352.5 million, the project seeks USD 60 million from the Green Climate Fund (GCF) to specifically fund electric vehicle equipment, solar-powered stations, and eMobility capacity building. Beyond mitigation, the project integrates 40km of new drainage networks to address Dakar's high vulnerability to flooding.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The project aims to achieve a total mitigation impact of 2 million tCO2eq over its lifespan by shifting users from private vehicles and aging buses to an electric bus fleet.
  • The core infrastructure consists of an 18.3km fully segregated BRT line connecting Petersen Bus Station in the town center to Guédiawaye Prefecture in the northern suburbs, featuring 23 stations and 3 major passenger terminals.
  • The project will deploy 159 electric articulated buses, each with a capacity of 150 passengers, supported by 76 charging stations and 3 transformers.
  • To address climate adaptation and flood risks in the Greater Dakar Area, the project includes 40km of new drainage networks and the rehabilitation of existing systems, with 15% of infrastructure costs allocated to drainage.
  • The total indicative project cost is USD 352.5 million, with USD 60 million requested from the GCF, consisting of a USD 15 million grant and a USD 45 million senior loan.
  • The project is a flagship commitment in Senegal's Nationally Determined Contributions (NDC) and the 'Plan Emergent 2035 – PSE', serving as the first BRT project in francophone Africa.

Cite the original document

APA
Green Climate Fund (2021). Dakar Bus Rapid Transit Pilot Project. https://www.greenclimate.fund/sites/default/files/document/14160-dakar-bus-rapid-transit-pilot-project.pdf
Chicago
Green Climate Fund. Dakar Bus Rapid Transit Pilot Project. 2021. https://www.greenclimate.fund/sites/default/files/document/14160-dakar-bus-rapid-transit-pilot-project.pdf.
Wikipedia
{{cite report |author=Green Climate Fund |title=Dakar Bus Rapid Transit Pilot Project |date=1 February 2021 |url=https://www.greenclimate.fund/sites/default/files/document/14160-dakar-bus-rapid-transit-pilot-project.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{greenclimatefund2021dakar, author = {{Green Climate Fund}}, title = {{Dakar Bus Rapid Transit Pilot Project}}, institution = {Green Climate Fund}, year = {2021}, month = feb, url = {https://www.greenclimate.fund/sites/default/files/document/14160-dakar-bus-rapid-transit-pilot-project.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated