The Burn Book: Incinerators that Threaten the Climate, Public Health, and our Finances
Summary
This report analyzes 20 global incinerators to demonstrate that waste-to-energy infrastructure creates long-term financial and contractual 'waste lock-in' while generating significant greenhouse gas emissions and toxic ash.
Key insights
- Waste incineration creates 'waste lock-in' or 'waste entrapment,' where long-term contracts, debt, and minimum-tonnage requirements (such as put-or-pay provisions) financially obligate municipalities to maintain high waste volumes for decades, discouraging recycling and waste prevention.
- Incinerators generate substantial greenhouse gas emissions, including both fossil CO2 from plastics and biogenic CO2; for example, the Runcorn facility in the UK released approximately 1.11 million MT of CO2 in 2025.
- Incineration produces toxic residues, including bottom ash and fly ash, which require hazardous waste management; the 20 studied facilities generated at least 1.7 million metric tons of toxic ash annually based on data for 17 facilities.
- Many incinerators are located in overburdened environmental-justice communities, contributing to cumulative pollution burdens; in Newark, NJ, the Essex facility is located in the Ironbound neighborhood, where one in four children has asthma.
- Incinerators often burn materials that could be recovered or composted; for instance, a 2022 analysis of household residual waste for the Beddington facility in the UK found that half of the material in a typical bin could have been recycled.
- The Timarpur-Okhla plant in India has a history of severe pollution violations, with 2021 monitoring showing dioxins and furans at nearly ten times the legal limit and hydrogen chloride at nearly four times the limit.
- The Reppie facility in Ethiopia has underperformed significantly, processing only 396–650 MT/day against a design capacity of 1,400 MT/day, leading to annual compensation payments of over $1.83 million USD to Ethiopian Electric Power.
- The Amager Bakke facility in Denmark illustrates financial risk due to overcapacity, as its 560,000 MT/year capacity exceeds local waste volumes (approximately 350,000 MT/year), forcing the facility to import waste to service its debt.
- The legacy of incineration persists after closure, as seen in Lausanne, Switzerland, where the Vallon plant closed in 2005 but left widespread dioxin and furan contamination in soils.
- The Pomona project in Zimbabwe is linked to an international corruption controversy involving Geogenix B.V., with allegations from Albania's Special Anti-Corruption Structure regarding concealed beneficial ownership and falsified invoices.
Cite the original document
- APA
- Global Alliance for Incinerator Alternatives (2026). The Burn Book: Incinerators that Threaten the Climate, Public Health, and our Finances. https://www.no-burn.org/wp-content/uploads/2026/10/Burn-Book.pdf
- Chicago
- Global Alliance for Incinerator Alternatives. The Burn Book: Incinerators that Threaten the Climate, Public Health, and our Finances. 2026. https://www.no-burn.org/wp-content/uploads/2026/10/Burn-Book.pdf.
- Wikipedia
- {{cite report |author=Global Alliance for Incinerator Alternatives |title=The Burn Book: Incinerators that Threaten the Climate, Public Health, and our Finances |date=2026 |url=https://www.no-burn.org/wp-content/uploads/2026/10/Burn-Book.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000265)}}
- BibTeX
- @techreport{globalallianceforincineratoralternatives2026burn, author = {{Global Alliance for Incinerator Alternatives}}, title = {{The Burn Book: Incinerators that Threaten the Climate, Public Health, and our Finances}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2026}, url = {https://www.no-burn.org/wp-content/uploads/2026/10/Burn-Book.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000265} }
Full text
Collected · Record updated