A guide for cities and municipalities faced with waste-to-energy incinerator proposals

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document argues that thermal waste-to-energy incinerators are expensive, polluting, and technically unproven for mixed municipal solid waste, recommending that cities adopt a Zero Waste approach instead.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Thermal waste-to-energy (WTE) incinerators, including gasification, pyrolysis, and plasma arc facilities, produce hazardous air emissions such as cancer-causing dioxins and furans, as well as toxic ash and liquid residues classified as hazardous waste.
  • WTE incinerators are not waste disposal facilities but treatment facilities; they do not eliminate the need for landfills, as a specialized hazardous waste landfill is required to dispose of the toxic ash and residues produced.
  • Gasification, pyrolysis, and plasma arc technologies are not proven for treating mixed municipal solid waste (MSW) at scale, with no commercial WTE gasification plant currently operating successfully worldwide due to the heterogeneous nature of waste.
  • WTE incinerators are the most expensive method for waste management and energy generation, with capital costs for thermal technologies ranging from USD 105 million to USD 172.5 million for 15 MW output facilities.
  • Energy generated from WTE incineration is not renewable because it relies on non-renewable materials like plastics derived from fossil fuels and paper from unsustainably harvested forests.
  • WTE facilities are often financially non-viable, as energy sales rarely cover capital and operational costs, leading companies to rely on expensive long-term 'put-or-pay' contracts and tipping fees from municipalities.
  • European countries that over-invested in incineration are now facing 'lock-in' effects, where they have more incineration capacity than non-recyclable waste and must import waste to keep plants operating.

Cite the original document

APA
Global Alliance for Incinerator Alternatives (n.d.). A guide for cities and municipalities faced with waste-to-energy incinerator proposals. https://www.no-burn.org/wp-content/uploads/2022/08/A-guidebook-for-cities-and-municipalities-faced-with-incinerator-proposals.pdf
Chicago
Global Alliance for Incinerator Alternatives. A guide for cities and municipalities faced with waste-to-energy incinerator proposals. n.d. https://www.no-burn.org/wp-content/uploads/2022/08/A-guidebook-for-cities-and-municipalities-faced-with-incinerator-proposals.pdf.
Wikipedia
{{cite report |author=Global Alliance for Incinerator Alternatives |title=A guide for cities and municipalities faced with waste-to-energy incinerator proposals |url=https://www.no-burn.org/wp-content/uploads/2022/08/A-guidebook-for-cities-and-municipalities-faced-with-incinerator-proposals.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000217)}}
BibTeX
@techreport{globalallianceforincineratoralternativesndguide, author = {{Global Alliance for Incinerator Alternatives}}, title = {{A guide for cities and municipalities faced with waste-to-energy incinerator proposals}}, institution = {Global Alliance for Incinerator Alternatives}, url = {https://www.no-burn.org/wp-content/uploads/2022/08/A-guidebook-for-cities-and-municipalities-faced-with-incinerator-proposals.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000217} }

Full text

Collected · Record updated