Não à iniciação na América Latina: Temuco, Chile

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

In 2016, WTE Araucanía SPA proposed a waste incinerator in Lautaro, Chile, designed to process 200,000 tonnes of waste per year, primarily from Temuco. Local citizens actively campaigned against the project, leading to its rejection by local governance.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In 2016, the company WTE Araucanía SPA proposed installing a waste incinerator in the city of Lautaro, located in the Cautín province of the Araucanía region, with a capacity to treat 200,000 tonnes of waste per year.
  • The incinerator was intended to initially process waste from the regional capital, Temuco, and eventually serve the entire region. Currently, the region generates 306,000 tonnes of waste annually, with at least half of that volume—originating from Temuco—being transported to the Bio Bio region at a monthly cost of 453,000 USD to the municipality.
  • The project was rejected by local governance following active efforts by citizens to educate themselves on the consequences of such projects and to repudiate the proposal.

Cite the original document

APA
Global Alliance for Incinerator Alternatives (2023). Não à iniciação na América Latina: Temuco, Chile. https://www.no-burn.org/resources/nao-a-iniciacao-na-america-latina-temuco-chile/
Chicago
Global Alliance for Incinerator Alternatives. Não à iniciação na América Latina: Temuco, Chile. 2023. https://www.no-burn.org/resources/nao-a-iniciacao-na-america-latina-temuco-chile/.
Wikipedia
{{cite report |author=Global Alliance for Incinerator Alternatives |title=Não à iniciação na América Latina: Temuco, Chile |date=19 April 2023 |url=https://www.no-burn.org/resources/nao-a-iniciacao-na-america-latina-temuco-chile/ |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000086)}}
BibTeX
@techreport{globalallianceforincineratoralternatives2023iniciao, author = {{Global Alliance for Incinerator Alternatives}}, title = {{Não à iniciação na América Latina: Temuco, Chile}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2023}, month = apr, url = {https://www.no-burn.org/resources/nao-a-iniciacao-na-america-latina-temuco-chile/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000086} }

Full text

Collected · Record updated