Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document describes a World Bank-funded project that used a collaborative co-production approach to enhance the climate resilience of Dar es Salaam's Bus Rapid Transit (BRT) system. By integrating technical climate projections with local stakeholder knowledge, the project validated flood risk modelling and identified specific adaptation measures for both existing assets and future BRT lines. The process involved a wide array of city planners, engineers, and government agencies, resulting in improved flood risk maps and increased local capacity for climate-informed transport planning.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The co-production process integrated technical climate projections with local knowledge to improve flood risk modelling and identify adaptation strategies for the Bus Rapid Transit (BRT) network. This involved validating flood extent and duration using historical local knowledge and assessing the economic and social impacts of impassable roads.
  • The project produced specific recommendations to increase the climate resilience of the BRT system, focusing on both immediate actions for currently vulnerable assets and the integration of resilience into the design of future BRT lines currently under planning.
  • The most significant value of the co-production approach was realized during the communication and multi-stakeholder ground-truthing phases, which enabled transportation managers and investors to use flood risk maps incorporating climate projections for better planning.
  • The project highlighted the necessity of flexibility in project design to accommodate stakeholder needs and data constraints, noting that stakeholders often required analysis beyond what initial models provided to obtain useful information.

Cite the original document

APA
Future Climate for Africa (2018). case-study-12. https://web.archive.org/web/20230909175519id_/https://futureclimateafrica.org/coproduction-manual/book/text/case-study-12.html
Chicago
Future Climate for Africa. case-study-12. 2018. https://web.archive.org/web/20230909175519id_/https://futureclimateafrica.org/coproduction-manual/book/text/case-study-12.html.
Wikipedia
{{cite report |author=Future Climate for Africa |title=case-study-12 |date=2018 |url=https://web.archive.org/web/20230909175519id_/https://futureclimateafrica.org/coproduction-manual/book/text/case-study-12.html |access-date=5 November 2026 |via=Climate Insights Directory (document futcliaf-000154)}}
BibTeX
@techreport{futureclimateforafrica2018casestudy12, author = {{Future Climate for Africa}}, title = {{case-study-12}}, institution = {Future Climate for Africa}, year = {2018}, url = {https://web.archive.org/web/20230909175519id_/https://futureclimateafrica.org/coproduction-manual/book/text/case-study-12.html}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document futcliaf-000154} }

Full text

Collected · Record updated