Solution Toolkit: Actions for national/regional governments and policymakers
Summary
The document outlines a comprehensive framework for governments to speed up clean energy deployment by addressing regulatory, administrative, and societal barriers. Its most critical finding is that streamlining legal processes and setting enforced permitting targets can drastically reduce project delays, potentially cutting the legal challenge window for offshore wind from 9 years to 1.5 years.
Key insights
- Governments should establish a strategic vision for power systems with clear quantitative targets for zero-carbon electricity capacity and binding targets for grid emissions intensity to provide market certainty for investors and developers.
- Assigning renewable energy projects a priority development status in permit-granting and land use negotiations can fast-track projects and reduce the number and magnitude of legal challenges.
- To ensure sufficient land for the clean power scale-up, governments should designate 'Renewable Energy Zones' based on spatial planning and dedicate specific percentages of state or federal land to renewables.
- Streamlining legal processes by limiting the window for legal challenges to a maximum of four months after the latest of the Environmental Impact Assessment (EIA) or final permit acceptance, and capping appeals to two, can significantly reduce delays.
- The implementation of 'one-stop-shops'—single national contact points for permitting—and the use of digital permitting databases can reduce administrative burdens and allow governments to monitor and mitigate permitting bottlenecks.
- Repowering existing wind and solar assets should be streamlined so that new assessments only cover the difference between the new and old specifications rather than requiring a full new permit, which can save years in development timelines.
- The use of flexible 'box-model' or 'design envelope' permits allows developers to optimize turbine layout and technology within specified ranges, preventing projects from becoming technologically obsolete during long permitting periods.
- Governments should create comprehensive environmental data banks and digital mapping tools to allow developers to pre-screen sites and focus Environmental Impact Assessment resources more efficiently.
Cite the original document
- APA
- Energy Transitions Commission (2023). Solution Toolkit: Actions for national/regional governments and policymakers. https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_GovernmentST_vFinal.pdf
- Chicago
- Energy Transitions Commission. Solution Toolkit: Actions for national/regional governments and policymakers. 2023. https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_GovernmentST_vFinal.pdf.
- Wikipedia
- {{cite report |author=Energy Transitions Commission |title=Solution Toolkit: Actions for national/regional governments and policymakers |date=January 2023 |url=https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_GovernmentST_vFinal.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enertran-000078)}}
- BibTeX
- @techreport{energytransitionscommission2023solution, author = {{Energy Transitions Commission}}, title = {{Solution Toolkit: Actions for national/regional governments and policymakers}}, institution = {Energy Transitions Commission}, year = {2023}, month = jan, url = {https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_GovernmentST_vFinal.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enertran-000078} }
Full text
Collected · Record updated