Environmental Due Diligence (EDD) Of Renewable Energy Projects

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The guidelines outline a three-stage Environmental Due Diligence (EDD) process for small-scale hydroelectric projects: establishing a regulatory framework, performing an environmental appraisal, and monitoring the project post-approval. The appraisal stage utilizes a risk rating key (Low to High) and a comprehensive checklist of 30 potential environmental and social risks, ranging from biodiversity loss and fish migration barriers to public health risks and land use conflicts. The process emphasizes the identification of mitigation measures and the estimation of associated costs to ensure the financial viability and sustainability of the investment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Environmental Due Diligence (EDD) process is structured into three distinct stages: establishing the regulatory framework, conducting an environmental appraisal, and monitoring the project after approval.
  • The environmental appraisal stage involves four core steps: assessing environmental risks, determining mitigation measures, estimating the cost of risk management, and reporting the results.
  • Risk potential for small-scale hydro projects is rated on a scale from Low (L) to High (H), based on information availability, the severity of environmental impact, the probability of occurrence, and the availability of mitigation measures.
  • The guidelines identify 30 specific environmental and social risks associated with small-scale hydro, categorized into effluent emissions and contamination, biodiversity protection, public perception issues, and worker health and safety.
  • Key biodiversity risks for these projects include the creation of barriers to fish migration, loss of fauna and flora due to construction, and the alteration of aquatic habitats caused by instream barriers.
  • Public health risks, particularly in tropical countries, may include the increase of disease vectors such as mosquitoes and flies due to reservoir impoundment, potentially leading to epidemics of dengue, malaria, or schistosomiasis.
  • Risk management costs must include both the direct cost of mitigation measures and potential costs of non-compliance, such as fines, penalties, or project delays, as these can compromise financial viability.
  • Post-approval monitoring requirements vary by risk level: high-risk projects require regular independent site visits or audits, while low and moderate risk projects may only require annual or semi-annual reports from the project sponsor.

Cite the original document

APA
Basel Agency for Sustainable Energy (n.d.). Environmental Due Diligence (EDD) Of Renewable Energy Projects. https://energy-base.org/wp-content/uploads/2020/03/5.EDD-Small-scale-Hydroelectric-Energy-Systems.pdf
Chicago
Basel Agency for Sustainable Energy. Environmental Due Diligence (EDD) Of Renewable Energy Projects. n.d. https://energy-base.org/wp-content/uploads/2020/03/5.EDD-Small-scale-Hydroelectric-Energy-Systems.pdf.
Wikipedia
{{cite report |author=Basel Agency for Sustainable Energy |title=Environmental Due Diligence (EDD) Of Renewable Energy Projects |url=https://energy-base.org/wp-content/uploads/2020/03/5.EDD-Small-scale-Hydroelectric-Energy-Systems.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enbase-000027)}}
BibTeX
@techreport{baselagencyforsustainableenergyndenvironmental, author = {{Basel Agency for Sustainable Energy}}, title = {{Environmental Due Diligence (EDD) Of Renewable Energy Projects}}, institution = {Basel Agency for Sustainable Energy}, url = {https://energy-base.org/wp-content/uploads/2020/03/5.EDD-Small-scale-Hydroelectric-Energy-Systems.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enbase-000027} }

Full text

Collected · Record updated