Environmental Due Diligence (EDD) Of Renewable Energy Projects
Summary
The guidelines outline a three-stage Environmental Due Diligence (EDD) process for geothermal energy projects: establishing a regulatory framework, performing an environmental appraisal, and monitoring the project post-approval. The appraisal stage utilizes a risk rating key (Low to High) and a checklist of 17 specific risks across four categories: effluent emissions/contamination, biodiversity, worker health and safety, and public perception. The process emphasizes the need to estimate the costs of risk management, including potential non-compliance penalties, and requires ongoing monitoring through legal agreements until the investment is concluded.
Key insights
- The Environmental Due Diligence (EDD) process for geothermal energy is structured into three distinct stages: establishing the regulatory framework, conducting an environmental appraisal, and monitoring the project after approval.
- The environmental appraisal stage involves four core steps: assessing environmental and social risks, determining mitigation measures, estimating the costs of managing those risks, and reporting the results.
- Geothermal project risks are categorized into four main areas: effluent emissions, on-site contamination and hazardous materials; biodiversity protection; worker health and safety; and issues sensitive to public perception.
- The guidelines provide a risk rating key ranging from Low (L) to High (H), based on information availability, environmental impact, probability of occurrence, and the availability of mitigation measures.
- Specific geothermal risks identified include atmospheric emissions of CO2 and H2S, groundwater pollution, induced seismicity, hydrothermal eruptions, landslides, and ground subsidence, particularly in liquid-dominated reservoirs.
- Cost estimation for risk management must include both the direct cost of mitigation and potential costs of non-compliance, such as fines, penalties, or project delays, as these can affect the project's financial viability.
- Post-approval monitoring requirements vary by risk level: high-risk projects require regular intervals of monitoring (annually or semi-annually) and independent site visits or audits, while low and moderate risk projects may only require reports from the project sponsor.
Cite the original document
- APA
- Basel Agency for Sustainable Energy (n.d.). Environmental Due Diligence (EDD) Of Renewable Energy Projects. https://energy-base.org/wp-content/uploads/2020/03/4.EDD-Geothermal-Energy-Systems.pdf
- Chicago
- Basel Agency for Sustainable Energy. Environmental Due Diligence (EDD) Of Renewable Energy Projects. n.d. https://energy-base.org/wp-content/uploads/2020/03/4.EDD-Geothermal-Energy-Systems.pdf.
- Wikipedia
- {{cite report |author=Basel Agency for Sustainable Energy |title=Environmental Due Diligence (EDD) Of Renewable Energy Projects |url=https://energy-base.org/wp-content/uploads/2020/03/4.EDD-Geothermal-Energy-Systems.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enbase-000022)}}
- BibTeX
- @techreport{baselagencyforsustainableenergyndenvironmental, author = {{Basel Agency for Sustainable Energy}}, title = {{Environmental Due Diligence (EDD) Of Renewable Energy Projects}}, institution = {Basel Agency for Sustainable Energy}, url = {https://energy-base.org/wp-content/uploads/2020/03/4.EDD-Geothermal-Energy-Systems.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enbase-000022} }
Full text
Collected · Record updated