Environmental Due Diligence (EDD) Of Renewable Energy Projects

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The guidelines outline a three-stage Environmental Due Diligence (EDD) process for solar thermal energy projects: establishing a regulatory framework, performing an environmental appraisal, and monitoring the project post-approval. The appraisal stage uses specific checklists and risk matrices to evaluate issues such as water pollution, land use, and worker safety, rating them from Low (L) to High (H). The process emphasizes identifying mitigation measures and estimating the costs of risk management to ensure the financial viability of the investment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Environmental Due Diligence (EDD) process is structured into three distinct stages: establishing the regulatory framework, conducting an environmental appraisal, and monitoring the project after approval.
  • The environmental appraisal stage involves four core steps: assessing environmental risk, determining mitigation measures, estimating the cost of risk management, and reporting the results.
  • Solar thermal projects are assessed against specific environmental and social risks, including thermal or chemical pollution of waterways, biodiversity protection, worker health and safety, land use, depletion of local water resources, and visual impact.
  • The guidelines specify that parabolic trough and power tower systems have higher environmental footprints regarding land and water than other technologies, requiring approximately 4 hectares per MWe for collectors and heliostats and necessitating cooling water for conventional steam plants.
  • Risk potential is rated on a scale from Low (L) to High (H), where a 'High' rating indicates a probability of occurrence higher than 40% and potential for irreversible environmental damages or impacts on human communities.
  • Risk management costs must include both the direct cost of mitigation and potential costs of non-compliance, such as fines, penalties, or project delays, as these can compromise the financial viability of the investment.
  • Post-approval monitoring requirements vary by risk level: high-risk projects require regular intervals of monitoring (annually or semi-annually) including independent site visits or audits, while low and moderate risk projects may only require reports from the project sponsor.

Cite the original document

APA
Basel Agency for Sustainable Energy (n.d.). Environmental Due Diligence (EDD) Of Renewable Energy Projects. https://energy-base.org/wp-content/uploads/2020/03/3.EDD-Solar-Thermal-Energy-Systems.pdf
Chicago
Basel Agency for Sustainable Energy. Environmental Due Diligence (EDD) Of Renewable Energy Projects. n.d. https://energy-base.org/wp-content/uploads/2020/03/3.EDD-Solar-Thermal-Energy-Systems.pdf.
Wikipedia
{{cite report |author=Basel Agency for Sustainable Energy |title=Environmental Due Diligence (EDD) Of Renewable Energy Projects |url=https://energy-base.org/wp-content/uploads/2020/03/3.EDD-Solar-Thermal-Energy-Systems.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enbase-000019)}}
BibTeX
@techreport{baselagencyforsustainableenergyndenvironmental, author = {{Basel Agency for Sustainable Energy}}, title = {{Environmental Due Diligence (EDD) Of Renewable Energy Projects}}, institution = {Basel Agency for Sustainable Energy}, url = {https://energy-base.org/wp-content/uploads/2020/03/3.EDD-Solar-Thermal-Energy-Systems.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enbase-000019} }

Full text

Collected · Record updated