This submission argues that South Africa's plan to procure 9,600 MW of nuclear energy is financially risky and based on an outdated Integrated Resource Plan (IRP 2010) that underestimates costs by billions of rands.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Integrated Resource Plan (IRP) 2010-2030 is an inadequate basis for decision-making because its cost estimates for nuclear power are incomplete and outdated, failing to account for full life cycle costs such as decommissioning and waste management.
  • The South African government's assumption of a 92% load factor for nuclear plants is unrealistic, as the Koeberg reactors have a lifetime load factor of less than 70%.
  • The IRP 2010 uses a flat 8% discount rate for all energy options, which fails to reflect that nuclear power is the riskiest commercial generation option and should attract a higher cost of capital, potentially 12% to 16%.
  • Post-Fukushima safety improvements are estimated to increase the cost of nuclear technology by 5%, which would add approximately R15 billion to the project based on the R300 billion Budget Review figure.
  • The procurement of a 'fleet' of 9,600 MW of nuclear energy deviates from the IRP 2010 recommendation of committing to only 3,200 MW to mitigate financial risks.
  • The Department of Energy has failed to act transparently, excluding nuclear energy from regulations governing the procurement of new generation capacity and failing to provide feasibility studies or cost assumptions to Parliament.
  • The proposed nuclear program could cost between R400 billion and R1 trillion, significantly exceeding the R300 billion allocated in the 2012 Budget Review.
  • None of the Generation III or III+ nuclear technology options currently considered (including designs from France, USA, Korea, China, and Russia) are proven with operating reactors in service.

Cite the original document

APA
Earthlife Africa (2013). SUBMISSION ON: BUDGET APPROPRIATION BILL: PROPOSED NUCLEAR ENERGY INFRASTRUCTURE INVESTMENTS. https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-submission-May-2013.pdf
Chicago
Earthlife Africa. SUBMISSION ON: BUDGET APPROPRIATION BILL: PROPOSED NUCLEAR ENERGY INFRASTRUCTURE INVESTMENTS. 2013. https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-submission-May-2013.pdf.
Wikipedia
{{cite press release |author=Earthlife Africa |title=SUBMISSION ON: BUDGET APPROPRIATION BILL: PROPOSED NUCLEAR ENERGY INFRASTRUCTURE INVESTMENTS |date=10 May 2013 |url=https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-submission-May-2013.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000033)}}
BibTeX
@misc{earthlifeafrica2013submission, author = {{Earthlife Africa}}, title = {{SUBMISSION ON: BUDGET APPROPRIATION BILL: PROPOSED NUCLEAR ENERGY INFRASTRUCTURE INVESTMENTS}}, publisher = {Earthlife Africa}, year = {2013}, month = may, url = {https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-submission-May-2013.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000033} }

Full text

Collected · Record updated