Energy Crisis and National Nuclear Power Development Programme – Planning and Procurement of 9.6GW of nuclear power stations

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This submission by Earthlife Africa and SAFCEI argues that South Africa's proposed 9.6GW nuclear procurement is financially unviable and irrational, noting that actual construction costs for similar reactors are significantly higher than government estimates.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The South African government's estimate for nuclear construction costs in the updated Integrated Resource Plan (IRP) of $5,800/kW is considered unrealistic, as recent international data for European Pressurised Water Reactors (EPRs) suggests costs around $8,000/kW.
  • The IRP's assumed lifetime load factor of 92% is described as unprecedented and unrealistic, especially compared to the two Koeberg reactors which have achieved lifetime load factors of 69% over 20 years.
  • The procurement of 9.6GW of nuclear power stations is estimated to cost between R400 billion and R1 trillion.
  • The decision to commit to 9,600 MW of nuclear capacity was not a result of the Integrated Resource Planning (IRP) process but was instead imposed upon it by the government.
  • The planning and legislative framework for nuclear procurement in South Africa is incomplete, as the Draft 2012 Integrated Energy Plan (IEP) remains unfinalised and no specific Electricity Regulations for nuclear generation capacity have been promulgated.
  • The document asserts that the 2008 tender for nuclear capacity failed because the lowest bids, reported at approximately $6,000/kW, were too high to be financeable for Eskom.
  • The cost of capital used in the IRP (8%) assumes all energy options are equally risky, which the author argues is false as nuclear power is the riskiest commercial generation option due to its record of cost and time overruns.
  • The author argues that if more realistic assumptions for construction costs, cost of capital, and load factors were applied, the cost of nuclear power could be two to three times the expected level.
  • Current nuclear technology options, including the Areva EPR, AP1000, and designs from Korea, China, and Russia, are either not yet proven in service or have experienced significant construction delays and cost overruns.

Cite the original document

APA
Earthlife Africa (2015). Energy Crisis and National Nuclear Power Development Programme – Planning and Procurement of 9.6GW of nuclear power stations. https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-SAFCEI-Letter-to-the-Minister-Public-Enterprises-10-February-2015.pdf
Chicago
Earthlife Africa. Energy Crisis and National Nuclear Power Development Programme – Planning and Procurement of 9.6GW of nuclear power stations. 2015. https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-SAFCEI-Letter-to-the-Minister-Public-Enterprises-10-February-2015.pdf.
Wikipedia
{{cite press release |author=Earthlife Africa |title=Energy Crisis and National Nuclear Power Development Programme – Planning and Procurement of 9.6GW of nuclear power stations |date=10 February 2015 |url=https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-SAFCEI-Letter-to-the-Minister-Public-Enterprises-10-February-2015.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000032)}}
BibTeX
@misc{earthlifeafrica2015energy, author = {{Earthlife Africa}}, title = {{Energy Crisis and National Nuclear Power Development Programme – Planning and Procurement of 9.6GW of nuclear power stations}}, publisher = {Earthlife Africa}, year = {2015}, month = feb, url = {https://earthlife.org.za/wp-content/uploads/2020/06/ELA-JHB-SAFCEI-Letter-to-the-Minister-Public-Enterprises-10-February-2015.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000032} }

Full text

Collected · Record updated