Earthlife Africa submits that the Revised DEIR for the Nuclear-1 Power Station is unlawful because it fails to provide the decision-maker with essential data on macro-economic risks, catastrophic accident scenarios, and long-term waste management.
Key insights
- The Revised DEIR fails to assess macro-economic impacts of the Nuclear-1 Power Station, such as the effect of a R120bn expenditure on electricity prices for poor consumers and the intergenerational costs of construction and operation.
- The report does not assess worst-case scenario impacts, such as the environmental consequences of an earthquake or flood, and relies on generic data rather than a final plant design, which makes an accurate catastrophe analysis impossible.
- The assessment of radioactive waste is inadequate because it ignores cumulative impacts relative to the Koeberg Nuclear Power Station, fails to analyze the economic costs of long-term disposal, and omits the risk of spent fuel rod overheating in on-site pools.
- The Revised DEIR inaccurately claims that a 'no-go' option is not viable, contradicting the Integrated Resource Plan (IRP2) which identifies cost-effective, secure, no-nuclear scenarios.
- The Thyspunt site is deemed unsuitable for the project due to its exceptional archaeological, paleontological, and wilderness value, and its status as a 'cultural landscape' under the UNESCO World Heritage Convention.
- Conducting the EIA before selecting a final project design is premature, as the lack of specific design details precludes a meaningful assessment of mitigation measures, safety features, and site-specific impacts.
Cite the original document
- APA
- Earthlife Africa (2011). Submission on the Revised Draft Environmental Impact Report (“Revised DEIR”). https://earthlife.org.za/wp-content/uploads/2020/06/Earthlife-Africa-Jhb-Submission-to-Arcus-Gibb-Final.pdf
- Chicago
- Earthlife Africa. Submission on the Revised Draft Environmental Impact Report (“Revised DEIR”). 2011. https://earthlife.org.za/wp-content/uploads/2020/06/Earthlife-Africa-Jhb-Submission-to-Arcus-Gibb-Final.pdf.
- Wikipedia
- {{cite press release |author=Earthlife Africa |title=Submission on the Revised Draft Environmental Impact Report (“Revised DEIR”) |date=28 July 2011 |url=https://earthlife.org.za/wp-content/uploads/2020/06/Earthlife-Africa-Jhb-Submission-to-Arcus-Gibb-Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000025)}}
- BibTeX
- @misc{earthlifeafrica2011submission, author = {{Earthlife Africa}}, title = {{Submission on the Revised Draft Environmental Impact Report (“Revised DEIR”)}}, publisher = {Earthlife Africa}, year = {2011}, month = jul, url = {https://earthlife.org.za/wp-content/uploads/2020/06/Earthlife-Africa-Jhb-Submission-to-Arcus-Gibb-Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000025} }
Full text
Collected · Record updated