ESKOM SOC HOLDINGS LTD’S (ESKOM) APPLICATION TO POSTPONE COMPLIANCE WITH MINIMUM EMISSION STANDARDS FOR SULPHUR DIOXIDE (SO2) FOR MEDUPI POWER STATION

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Centre for Environmental Rights argues that Eskom's request to postpone sulphur dioxide emission standards is unjustified and potentially harmful to health, specifically citing non-compliance with air quality standards in the Waterberg Priority Area.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Eskom is seeking to be exempt from or postpone compliance with minimum emission standards (MES) for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxide (NOX) for almost all of its power stations, specifically seeking postponement of SO2 MES compliance dates for the Medupi Power Station.
  • Eskom justifies its application by claiming that power station emissions do not harm human health, that there is insufficient water for flue gas desulphurisation to control SO2, that retrofitting would cause electricity interruptions, and that compliance costs exceeding R210 billion would make electricity tariffs unaffordable.
  • Evidence suggests that ambient air quality standards in the Waterberg Priority Area (WPA) are likely in non-compliance, with 2009 data for Lephalale showing sulphur dioxide concentrations exceeded both hourly and daily standards.
  • The World Bank's Inspection Panel previously found that the Medupi project failed to fully consider viable alternatives to the least-cost options or use the best appropriate available technology to lower greenhouse gas emissions intensity.

Cite the original document

APA
Earthlife Africa (2013). ESKOM SOC HOLDINGS LTD’S (ESKOM) APPLICATION TO POSTPONE COMPLIANCE WITH MINIMUM EMISSION STANDARDS FOR SULPHUR DIOXIDE (SO2) FOR MEDUPI POWER STATION. https://earthlife.org.za/wp-content/uploads/2020/06/CER-letter-to-World-Bank-and-Inspection-Panel_8-Aug-2013_final.pdf
Chicago
Earthlife Africa. ESKOM SOC HOLDINGS LTD’S (ESKOM) APPLICATION TO POSTPONE COMPLIANCE WITH MINIMUM EMISSION STANDARDS FOR SULPHUR DIOXIDE (SO2) FOR MEDUPI POWER STATION. 2013. https://earthlife.org.za/wp-content/uploads/2020/06/CER-letter-to-World-Bank-and-Inspection-Panel_8-Aug-2013_final.pdf.
Wikipedia
{{cite press release |author=Earthlife Africa |title=ESKOM SOC HOLDINGS LTD’S (ESKOM) APPLICATION TO POSTPONE COMPLIANCE WITH MINIMUM EMISSION STANDARDS FOR SULPHUR DIOXIDE (SO2) FOR MEDUPI POWER STATION |date=8 August 2013 |url=https://earthlife.org.za/wp-content/uploads/2020/06/CER-letter-to-World-Bank-and-Inspection-Panel_8-Aug-2013_final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000019)}}
BibTeX
@misc{earthlifeafrica2013eskom, author = {{Earthlife Africa}}, title = {{ESKOM SOC HOLDINGS LTD’S (ESKOM) APPLICATION TO POSTPONE COMPLIANCE WITH MINIMUM EMISSION STANDARDS FOR SULPHUR DIOXIDE (SO2) FOR MEDUPI POWER STATION}}, publisher = {Earthlife Africa}, year = {2013}, month = aug, url = {https://earthlife.org.za/wp-content/uploads/2020/06/CER-letter-to-World-Bank-and-Inspection-Panel_8-Aug-2013_final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000019} }