Challenging the Glades Power Plant
Summary
Earthjustice blocked Florida Power & Light's proposal for a massive coal-fired power plant at the edge of the Florida Everglades in 2007. The Florida Public Service Commission rejected the project based on evidence regarding climate change, lack of energy conservation, and cost effectiveness. Consequently, Florida Power & Light invested $300 million in a 75 megawatt solar thermal facility, completed in 2010, which became the largest of its kind in the eastern United States.
Key insights
- In June 2007, the Florida Public Service Commission unanimously rejected Florida Power & Light's proposal for a coal-fired power plant, which would have been the largest in the United States. The decision followed a review of evidence concerning climate change, the absence of energy-reducing conservation measures, and the project's cost effectiveness.
- Following the blockage of the coal plant, Florida Power & Light invested $300 million to construct a 75 megawatt solar thermal facility. Completed in 2010, this facility is the largest solar thermal plant in the eastern United States.
- The proposed coal plant posed significant environmental risks to the Florida Everglades, Lake Okeechobee, and local estuaries, contributing to air pollution and the emission of greenhouse gases like carbon dioxide and nitrous oxide.
Cite the original document
- APA
- Earthjustice (2007). Challenging the Glades Power Plant. https://earthjustice.org/case/glades-power-plant
- Chicago
- Earthjustice. Challenging the Glades Power Plant. 2007. https://earthjustice.org/case/glades-power-plant.
- Wikipedia
- {{cite report |author=Earthjustice |title=Challenging the Glades Power Plant |date=30 May 2007 |url=https://earthjustice.org/case/glades-power-plant |access-date=17 August 2026 |via=Climate Insights Directory (document earjust-000022)}}
- BibTeX
- @techreport{earthjustice2007challenging, author = {{Earthjustice}}, title = {{Challenging the Glades Power Plant}}, institution = {Earthjustice}, year = {2007}, month = may, url = {https://earthjustice.org/case/glades-power-plant}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory, document earjust-000022} }
Full text
Collected · Record updated