PLUGGING THE ENERGY GAP
Summary
The report asserts that deploying approximately 50GW of renewable generation—primarily onshore wind, offshore wind, and solar PV—is the most cost-effective way for the UK to meet its 2030 carbon intensity target of 100g/kWh. Based on an Imperial College London study, it finds that system integration costs for renewables remain low (typically under £10/MWh) across various scenarios, making them cheaper than nuclear power. The authors recommend that the UK Government establish a clear deployment trajectory in its Emissions Reduction Plan, redesign the Levy Control Framework, and mandate Ofgem to implement market reforms that increase system flexibility through storage, interconnection, and demand-side response.
Key insights
- To meet the 5th Carbon Budget, the UK must construct new low-carbon generation capacity capable of producing over 150TWh of electricity annually by 2030, which is roughly half of current output. This requirement necessitates a significant increase in renewable generation, likely around 50GW, consisting mainly of solar PV, onshore wind, and offshore wind.
- System integration costs for variable renewable generation are predicted to remain below £10/MWh for a wide range of system characteristics and penetration levels. Consequently, high levels of renewable generation are a cheaper option for the power system than any alternative generation solution.
- Renewable technologies are more cost-effective than nuclear power when considering whole-system costs. Specifically, onshore wind is estimated to be at least 22% cheaper than nuclear, while solar PV and offshore wind provide savings of over 8% and 4% respectively.
- The report identifies a policy gap in the UK's current approach, specifically the 'freeze' on onshore wind development and continued support for new nuclear. It argues that maintaining the onshore wind freeze will increase costs for consumers and that meeting carbon targets at the lowest cost requires relaxing this freeze and increasing offshore wind ambition.
- Increasing system flexibility is critical to reducing integration costs and avoiding curtailment. Flexibility can be achieved through demand-side response, storage technologies (such as batteries), and increased interconnection between countries. A 'no progress' scenario on flexibility would lead to significantly higher integration costs, potentially escalating to £30/MWh earlier in the decade.
- The report recommends three primary government actions: providing a clear trajectory for low-carbon generation in the Emissions Reduction Plan, redesigning the Levy Control Framework to provide investor confidence and a timetable for auctions, and mandating Ofgem to ensure market mechanisms support a flexible system.
Cite the original document
- APA
- SKILLINGS, S., & LAFFORD, T. (2016). PLUGGING THE ENERGY GAP. E3G. https://www.e3g.org/wp-content/uploads/docs/Plugging_the_Energy_Gap.pdf
- Chicago
- SKILLINGS, SIMON, and TOM LAFFORD. PLUGGING THE ENERGY GAP. E3G, 2016. https://www.e3g.org/wp-content/uploads/docs/Plugging_the_Energy_Gap.pdf.
- Wikipedia
- {{cite report |last1=SKILLINGS |first1=SIMON |last2=LAFFORD |first2=TOM |title=PLUGGING THE ENERGY GAP |publisher=E3G |date=November 2016 |url=https://www.e3g.org/wp-content/uploads/docs/Plugging_the_Energy_Gap.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001311)}}
- BibTeX
- @techreport{skillings2016plugging, author = {SKILLINGS, SIMON and LAFFORD, TOM}, title = {{PLUGGING THE ENERGY GAP}}, institution = {E3G}, year = {2016}, month = nov, url = {https://www.e3g.org/wp-content/uploads/docs/Plugging_the_Energy_Gap.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001311} }