Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document identifies systemic failures in the UK's fragmented approach to home retrofitting, where short-term, competitive grant schemes have led to high underspends and regional inequalities. It advocates for a ten-year infrastructure investment pledge and a transition from project-based 'challenge' funding to a needs-based allocation model, similar to Scotland's Area-Based Schemes. Key recommendations include providing revenue funding to build local authority capacity, investing in green skills to meet labor demands, and establishing a regulatory framework for local heat and energy planning to ensure efficient decarbonisation of housing stock.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The UK's current fragmented system of short-term and conflicting public schemes has hindered the delivery of home upgrades, resulting in significant underspends. Specifically, 43% of Local Authority Delivery (LAD) and Social Housing Decarbonisation Fund (SHDF) funds and 79% of Home Upgrade Grant (HUG) funds were underspent, with HUG phase 1 seeing only 21% of funds spent.
  • There is a significant 'postcode lottery' in retrofit delivery across England, where funding does not always reach the areas of greatest need. For instance, the West Midlands and Yorkshire and the Humber have the lowest median energy efficiency but have retrofitted the fewest homes using local authority funding.
  • Scotland's Area-Based Schemes (ABS), operating since 2013, provide a successful model for locally led retrofit due to their longevity and use of a formula-based, needs-based allocation of funding rather than competitive bidding.
  • Local authority capacity is a critical barrier to delivery, exacerbated by a decade of core service cuts. Many authorities lack the internal resource to apply for grants or manage projects, often relying on large consortia which can fail due to supply chain issues.
  • A severe shortage of skilled labor threatens retrofit targets; for example, upgrading London's properties to EPC C by 2035 would require between 19,000 and 28,000 workers, far exceeding the 9,000 training places announced by the government in 2022.
  • There is a substantial gap in England for local area energy plans and heat strategies. While heat networks may cover 20% of homes, a regulatory framework is needed to identify cost-effective low-carbon options for the remaining 80%, such as shared ground source heating for urban terraced streets.

Cite the original document

APA
DYSON, J. (2024). A NEW DEAL FOR LOCALLY LED HOME UPGRADES. E3G. https://www.e3g.org/wp-content/uploads/A-new-deal-for-locally-led-home-ugprades.pdf
Chicago
DYSON, JAMES. A NEW DEAL FOR LOCALLY LED HOME UPGRADES. E3G, 2024. https://www.e3g.org/wp-content/uploads/A-new-deal-for-locally-led-home-ugprades.pdf.
Wikipedia
{{cite report |last1=DYSON |first1=JAMES |title=A NEW DEAL FOR LOCALLY LED HOME UPGRADES |publisher=E3G |date=February 2024 |url=https://www.e3g.org/wp-content/uploads/A-new-deal-for-locally-led-home-ugprades.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-000655)}}
BibTeX
@techreport{dyson2024new, author = {DYSON, JAMES}, title = {{A NEW DEAL FOR LOCALLY LED HOME UPGRADES}}, institution = {E3G}, year = {2024}, month = feb, url = {https://www.e3g.org/wp-content/uploads/A-new-deal-for-locally-led-home-ugprades.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-000655} }

Full text

Collected · Record updated