Growing clean steel in the UK
Summary
The UK currently plans to move to 100% secondary steelmaking using recycled scrap, a strategy E3G argues will lead to job losses and import dependency. The report proposes a public investment of £2.1–3.5 billion to convert plants at Port Talbot and Scunthorpe to low-carbon primary steel facilities and establish a clean steel fund to increase domestic capacity for hydrogen-DRI and low-emissions primary steel.
Key insights
- The UK's current plan to eliminate iron and primary steelmaking in favor of 100% secondary steelmaking using recycled scrap is unique among industrialised nations and risks causing thousands of job losses and import dependency for the clean energy and transport sectors.
- Public investment between £2.1 billion and £3.5 billion could enable the conversion of steel plants at Scunthorpe and Port Talbot into low-carbon primary steel facilities and support new facilities elsewhere in the UK.
- To establish a clean steel sector, the government should create a fund to add 4.44 Mt of low-emissions primary steel capacity, 5 Mt of domestic hydrogen-DRI capacity, and 3.78 Mt of additional secondary steel capacity.
Cite the original document
- APA
- E3G (2024). Growing clean steel in the UK. https://www.e3g.org/publications/growing-clean-steel-in-the-uk/
- Chicago
- E3G. Growing clean steel in the UK. 2024. https://www.e3g.org/publications/growing-clean-steel-in-the-uk/.
- Wikipedia
- {{cite report |author=E3G |title=Growing clean steel in the UK |date=24 June 2024 |url=https://www.e3g.org/publications/growing-clean-steel-in-the-uk/ |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-000525)}}
- BibTeX
- @techreport{e3g2024growing, author = {{E3G}}, title = {{Growing clean steel in the UK}}, institution = {E3G}, year = {2024}, month = jun, url = {https://www.e3g.org/publications/growing-clean-steel-in-the-uk/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-000525} }
Full text
Collected · Record updated