The document outlines a three-phase deployment of CSP in South Africa, targeting 100 GW of capacity by 2050 to save 3,850 Mt CO2-eq. It identifies critical barriers in technology, regulation, and infrastructure, specifically highlighting the need for grid expansion in the north-west and the operationalization of the Renewable Energy Feed-In Tariff (REFIT). The authors argue that international financial support is essential to overcome high investment costs and risk, proposing specific funding mechanisms for R&D and infrastructure.
Key insights
- The proposed large-scale CSP rollout is divided into three phases: a 'Start' phase (2010-2015) targeting 2 GW, a 'Scale-up' phase (2016-2020) targeting 7 GW, and a 'Rollout' phase (2021-2050) aiming for 100 GW of capacity.
- The large-scale rollout of CSP could result in 3,850 Mt CO2-eq of greenhouse gas emissions being saved between 2010 and 2050.
- Incremental investment costs for the rollout are estimated at R3.9-10.3 billion per year if technology learning rates of 15-20% are experienced, but could drop to R3.6-3.9 billion per year if a local supply of CSP components is established.
- The levelised cost of electricity (LEC) from CSP is projected to become competitive with nuclear power by 2026 and with conventional coal by 2045.
- Water availability is identified as a critical long-term barrier; the lower Orange River's available water for development (150 million m3 annually) would limit CSP capacity in that region to just over 50 GW.
- Significant grid expansion is required to link high-irradiation areas in the north-west to consumer centres, with potential costs for the 'Rollout' phase (2021-2050) estimated at R700-800 billion for approximately 60 new transmission lines.
- The Renewable Energy Feed-In Tariff (REFIT) provides a power purchase agreement of R2.10 per kWh for CSP developments using parabolic trough technology with six hours of storage.
- International financial support is deemed the most vital requirement, with proposed risk-sharing for the first 100 MW plant (50%) and four subsequent 100 MW plants (25%), totaling an estimated R10 billion.
- Stakeholders identified 'electricity produced' from CSP plants as the most successful indicator for monitoring the rollout, followed by licenses issued, plants under construction, and committed finance.
Cite the original document
- APA
- Edkins, M., Winkler, H., & Marquard, A. (2009). Large-scale Rollout of Concentrating Solar Power in South Africa. Climate Strategies. https://climatestrategies.org/wp-content/uploads/2014/11/isda-za-csp-september-2009-report.pdf
- Chicago
- Edkins, Max, Harald Winkler, and Andrew Marquard. Large-scale Rollout of Concentrating Solar Power in South Africa. Climate Strategies, 2009. https://climatestrategies.org/wp-content/uploads/2014/11/isda-za-csp-september-2009-report.pdf.
- Wikipedia
- {{cite report |last1=Edkins |first1=Max |last2=Winkler |first2=Harald |last3=Marquard |first3=Andrew |title=Large-scale Rollout of Concentrating Solar Power in South Africa |publisher=Climate Strategies |date=September 2009 |url=https://climatestrategies.org/wp-content/uploads/2014/11/isda-za-csp-september-2009-report.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{edkins2009largescale, author = {Edkins, Max and Winkler, Harald and Marquard, Andrew}, title = {{Large-scale Rollout of Concentrating Solar Power in South Africa}}, institution = {Climate Strategies}, year = {2009}, month = sep, url = {https://climatestrategies.org/wp-content/uploads/2014/11/isda-za-csp-september-2009-report.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated