The report finds that transitioning to a zero-carbon GB power system requires new, faster-acting frequency response services and a market for fault current, as existing services and the displacement of synchronous generators create risks to system stability.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In 2018/19, £1.2bn was spent on balancing services, the highest since 2011/12, with £615m of this attributed to maintaining power system operability, specifically voltage, Rate of Change of Frequency (RoCoF), and transmission network constraints.
  • National Grid ESO's (NGESO) 'end-state' frequency response services are not technology agnostic and appear to favour batteries over wind, solar, and some demand response. Additionally, the requirement for symmetrical frequency response provision acts as a barrier to some providers and may conflict with 2019 EU Electricity Markets regulation.
  • Existing and proposed frequency response services may be inadequate for extremely low inertia scenarios. Risk to security of electricity supply is estimated to exist for approximately 1% of the year in 2025 and could increase to 22% of the year by 2030 as non-synchronous generation penetration increases.
  • The penetration of non-synchronous generation is primarily limited by the RoCoF limit and the minimum baseload power supply from nuclear power plants, which cannot be deloaded or used for frequency containment reserve.
  • There is currently no market for short circuit current capabilities in GB, as these are provided for free by synchronous generators. Providing this capability via oversized power electronic converters is estimated to be 2 to 3 times more expensive than using synchronous machines.
  • Scotland faces specific security of supply risks due to the closure of several power stations, leaving Peterhead as the sole large synchronous generator capable of sustaining maximum output for multiple days. This creates uncertainty regarding angular stability during short circuit faults on export boundaries.

Cite the original document

APA
Nedd, M., Browell, J., Egea-Alvarez, A., Bell, K., Hamilton, R., Wang, S., & Brush, S. (2020). Operating a zero-carbon GB power system: implications for Scotland. ClimateXChange. https://www.climatexchange.org.uk/wp-content/uploads/2023/09/operating-a-zero-carbon-gb-power-system-_implications-for-scotland.pdf
Chicago
Nedd, Marcel, Jethro Browell, Agusti Egea-Alvarez, Keith Bell, Robert Hamilton, Shuren Wang, and Susan Brush. Operating a zero-carbon GB power system: implications for Scotland. ClimateXChange, 2020. https://www.climatexchange.org.uk/wp-content/uploads/2023/09/operating-a-zero-carbon-gb-power-system-_implications-for-scotland.pdf.
Wikipedia
{{cite report |last1=Nedd |first1=Marcel |last2=Browell |first2=Jethro |last3=Egea-Alvarez |first3=Agusti |last4=Bell |first4=Keith |last5=Hamilton |first5=Robert |last6=Wang |first6=Shuren |last7=Brush |first7=Susan |title=Operating a zero-carbon GB power system: implications for Scotland |publisher=ClimateXChange |date=December 2020 |url=https://www.climatexchange.org.uk/wp-content/uploads/2023/09/operating-a-zero-carbon-gb-power-system-_implications-for-scotland.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document climex-000534)}}
BibTeX
@techreport{nedd2020operating, author = {Nedd, Marcel and Browell, Jethro and Egea-Alvarez, Agusti and Bell, Keith and Hamilton, Robert and Wang, Shuren and Brush, Susan}, title = {{Operating a zero-carbon GB power system: implications for Scotland}}, institution = {ClimateXChange}, year = {2020}, month = dec, url = {https://www.climatexchange.org.uk/wp-content/uploads/2023/09/operating-a-zero-carbon-gb-power-system-_implications-for-scotland.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climex-000534} }

Full text

Collected · Record updated