This evidence review finds that while new developments offer efficiencies in civil works and District Network Operator (DNO) upgrades, there is a lack of quantitative data to precisely measure the cost difference between new installations and retrofits.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • There is a lack of quantitative data to establish the exact cost difference between installing EV charge points in new developments or those undergoing major renovation compared to retrofitting.
  • New developments provide cost efficiencies over retrofits by avoiding additional civil works, such as digging trenches or laying and ducting electrical cables, which are typically integrated into the initial construction.
  • Installing chargers in new developments is generally more cost-efficient regarding District Network Operator (DNO) upgrades, as capacity requirements are typically considered during the development phase.
  • DNO costs can vary significantly; while individual residential installations with private driveways often incur no DNO cost, major capacity upgrades for a development can exceed £100,000.
  • Geographic location significantly impacts installation costs due to supply-chain issues, labour availability, and travel costs, with costs being generally higher in remote and island areas.
  • Non-residential installations are more expensive and show greater cost variability than residential ones, primarily driven by the required voltage and the type of car park (private vs shared).
  • Advancements in battery and EV technologies, including Vehicle-to-Grid (V2G) capabilities, are expected to have little impact on residential and non-residential charging requirements in the short to medium term.

Cite the original document

APA
Crouse, M., Trousdale, D., Mulley, B., Mahmud, M., & Cunningham, S. (2022). Electric vehicle enabled buildings. ClimateXChange. https://www.climatexchange.org.uk/wp-content/uploads/2023/09/cxc-electric-vehicle-enabled-buildings-evidence-review-of-installation-costs-may-2022.pdf
Chicago
Crouse, Monika, David Trousdale, Bipin Mulley, Moshiuzzaman Mahmud, and Scott Cunningham. Electric vehicle enabled buildings. ClimateXChange, 2022. https://www.climatexchange.org.uk/wp-content/uploads/2023/09/cxc-electric-vehicle-enabled-buildings-evidence-review-of-installation-costs-may-2022.pdf.
Wikipedia
{{cite report |last1=Crouse |first1=Monika |last2=Trousdale |first2=David |last3=Mulley |first3=Bipin |last4=Mahmud |first4=Moshiuzzaman |last5=Cunningham |first5=Scott |title=Electric vehicle enabled buildings |publisher=ClimateXChange |date=May 2022 |url=https://www.climatexchange.org.uk/wp-content/uploads/2023/09/cxc-electric-vehicle-enabled-buildings-evidence-review-of-installation-costs-may-2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document climex-000270)}}
BibTeX
@techreport{crouse2022electric, author = {Crouse, Monika and Trousdale, David and Mulley, Bipin and Mahmud, Moshiuzzaman and Cunningham, Scott}, title = {{Electric vehicle enabled buildings}}, institution = {ClimateXChange}, year = {2022}, month = may, url = {https://www.climatexchange.org.uk/wp-content/uploads/2023/09/cxc-electric-vehicle-enabled-buildings-evidence-review-of-installation-costs-may-2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climex-000270} }

Full text

Collected · Record updated