Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This case study examines the regional implementation of Energy Performance Certificates in Belgium, finding that Flanders employs the most rigorous quality assurance and mandatory re-training for assessors, while Wallonia has successfully reduced EPC costs through process shortening.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In Belgium, the responsibility for implementing the Energy Performance of Buildings Directive (EPBD) and the Independent Control System (ICS) is delegated to regional governments: the Flemish Energy and Climate Energy Agency (VEKA) in Flanders, the Department of Energy and Sustainable Buildings in Wallonia, and the Brussels Environment Office (BEO) in Brussels.
  • Flanders implements a rigorous quality assurance system for EPCs, combining random sampling, desk-based reviews, and on-site audits, with approximately 300-400 random checks conducted annually.
  • Wallonia reduced the cost of EPCs for single-family houses from €480 to €240 between the early stages of the scheme and 2020 by shortening the certification process.
  • Assessor accreditation requirements vary by region: Flanders requires mandatory annual re-training; Wallonia allows a flexible pathway based on education or professional experience; and Brussels requires specific degrees in architecture or engineering.
  • Enforcement mechanisms for displaying EPCs at the point of sale or rent differ across regions, with Brussels implementing the most severe potential penalties, including imprisonment for eight to twelve months and fines up to €25,000 for non-compliant estate agencies.
  • Wallonia uses a digital 'control web' application to automatically screen all submitted EPCs and flag inconsistent data, which then informs a statistically representative manual review process.
  • Neither Flanders nor Wallonia has implemented a lodgement fee for issuing EPCs, with Wallonia citing high administrative costs of maintaining such a scheme as a reason for its absence.

Cite the original document

APA
Doherty, O., Sloan, B., & Macleod, F. (2024). Operational delivery of EPCs in Europe  case study. ClimateXChange. https://www.climatexchange.org.uk/wp-content/uploads/2025/01/Appendix-C-Belgium-case-study.pdf
Chicago
Doherty, Orla, Beth Sloan, and Fraser Macleod. Operational delivery of EPCs in Europe  case study. ClimateXChange, 2024. https://www.climatexchange.org.uk/wp-content/uploads/2025/01/Appendix-C-Belgium-case-study.pdf.
Wikipedia
{{cite report |last1=Doherty |first1=Orla |last2=Sloan |first2=Beth |last3=Macleod |first3=Fraser |title=Operational delivery of EPCs in Europe  case study |publisher=ClimateXChange |date=July 2024 |url=https://www.climatexchange.org.uk/wp-content/uploads/2025/01/Appendix-C-Belgium-case-study.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document climex-000165)}}
BibTeX
@techreport{doherty2024operational, author = {Doherty, Orla and Sloan, Beth and Macleod, Fraser}, title = {{Operational delivery of EPCs in Europe  case study}}, institution = {ClimateXChange}, year = {2024}, month = jul, url = {https://www.climatexchange.org.uk/wp-content/uploads/2025/01/Appendix-C-Belgium-case-study.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climex-000165} }

Full text

Collected · Record updated