Policy priorities for Serbian industry in the CBAM era

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document assesses the impact of the EU's Carbon Border Adjustment Mechanism (CBAM) on Serbia's electricity, iron and steel, aluminium, and cement sectors. It highlights that Serbia's high reliance on coal makes its exports structurally disadvantaged, particularly in electricity and steel. The briefing recommends a credible coal phase-out, fast-tracking renewable energy permitting, adopting low-carbon technologies like electric arc furnaces and calcined clays, and leveraging green finance and public procurement to drive industrial decarbonisation.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Serbia's electricity sector is highly exposed to CBAM because its production is three times more carbon intensive than the EU average, with coal providing approximately 62% of the country's electricity and a grid intensity of 667 gCO₂/kWh.
  • The power company Elektroprivreda Srbije is projected to lose EUR 150 million in exports in 2026 alone due to the carbon intensity of its production under CBAM.
  • The iron and steel sector is the most exposed CBAM sector in Serbia, with 70% of exports going to the EU (valued at EUR 556 million in 2024) and emissions intensity (2.11 tCO₂/t in 2018) significantly exceeding the EU average of 1.15 tCO₂/t.
  • Serbia's aluminium sector produces only semi-fabricated and finished products, meaning it lacks primary smelting and has less control over input carbon intensity; however, Impol Seval reported a 2025 Scope 1 emissions intensity of 0.594 tCO₂e/t, which is below CBAM default values of 1.51-2.27 tCO2e/t.
  • The cement sector, which accounts for over 2% of national emissions, can significantly reduce costs by up to 25% and emissions by up to 40% by increasing the use of abundant local calcined clays like LC3.
  • Critical bottlenecks to decarbonisation include a grid connection freeze by Elektromreža Srbije until 2029 due to insufficient transmission infrastructure and slow permitting processes for on-site renewables.
  • The document argues that Serbia's National Energy and Climate Plan (NECP) undermines competitiveness by allowing coal capacity to remain online until 2050, and recommends a credible phase-out with clear decommissioning dates.

Cite the original document

APA
Quill, E., & Waterton, O. (2026). Policy priorities for Serbian industry in the CBAM era. Climate Analytics. https://ca1-clm.edcdn.com/assets/Serbia-synthesis-report_FINAL.pdf?v=1790759008
Chicago
Quill, Eoin, and Olivia Waterton. Policy priorities for Serbian industry in the CBAM era. Climate Analytics, 2026. https://ca1-clm.edcdn.com/assets/Serbia-synthesis-report_FINAL.pdf?v=1790759008.
Wikipedia
{{cite report |last1=Quill |first1=Eoin |last2=Waterton |first2=Olivia |title=Policy priorities for Serbian industry in the CBAM era |publisher=Climate Analytics |date=September 2026 |url=https://ca1-clm.edcdn.com/assets/Serbia-synthesis-report_FINAL.pdf?v=1790759008 |access-date=5 November 2026 |via=Climate Insights Directory (document climanal-000592)}}
BibTeX
@techreport{quill2026policy, author = {Quill, Eoin and Waterton, Olivia}, title = {{Policy priorities for Serbian industry in the CBAM era}}, institution = {Climate Analytics}, year = {2026}, month = sep, url = {https://ca1-clm.edcdn.com/assets/Serbia-synthesis-report_FINAL.pdf?v=1790759008}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climanal-000592} }

Full text

Collected · Record updated