Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that the first-time implementation of Early Warning, Early Action (EW>EA) in 2008 reduced the cost per beneficiary by 33% and significantly decreased flood-related deaths in Ghana compared to 2007.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The implementation of Early Warning, Early Action (EW>EA) in 2008 resulted in a 33% lower cost per beneficiary for flood response compared to the costs of response alone in 2006 and 2007.
  • In Ghana, early actions based on forecasts for heavy rainfall and coordinated dam water release reduced flood-related deaths from over 30 in 2007 to 2 in 2008.
  • The use of EW>EA in Ghana led to a significant reduction in property loss; only 500 houses were lost to floods in 2008, compared to 3,742 lost in 2007, partly due to the adoption of a flood-resistant house model.
  • Response times improved significantly in 2008, with most countries receiving supplies in days, whereas in 2007 the Zone was estimated to be 40 days late in starting flood response operations.
  • In Togo, a newly developed early warning communication system allowed the community of Atiégou Zogbédji to evacuate within an hour and a half, resulting in no loss of life despite physical damage.
  • The IFRC West and Central Africa Zone (WCAZ) issued its first-ever preliminary emergency appeal in July 2008 to fund preparedness activities before a disaster struck, though donor systems were slow to respond, with most funds arriving only after floods began.
  • The WCAZ successfully used 'no-regrets' strategies, monitoring forecasts across multiple timescales (seasonal, dekadal, and short-term) and consulting multiple scientific sources to reduce uncertainty.
  • A critical gap remains in the communication chain, as seasonal forecasts are often not shared with local branches or communities, and volunteers often lack the meteorological training to provide credible warnings.
  • Logistical constraints, including poor roads, border crossing formalities, and a lack of vehicles and radios, continue to hinder the speed of response despite early warnings.

Cite the original document

APA
Red Cross Red Crescent Climate Centre (2009). Early Warning, Early Action. https://www.climatecentre.org/wp-content/uploads/EWEA-WCAZ-Evaluation.pdf
Chicago
Red Cross Red Crescent Climate Centre. Early Warning, Early Action. 2009. https://www.climatecentre.org/wp-content/uploads/EWEA-WCAZ-Evaluation.pdf.
Wikipedia
{{cite report |author=Red Cross Red Crescent Climate Centre |title=Early Warning, Early Action |date=2009 |url=https://www.climatecentre.org/wp-content/uploads/EWEA-WCAZ-Evaluation.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document clicent-000134)}}
BibTeX
@techreport{redcrossredcrescentclimatecentre2009early, author = {{Red Cross Red Crescent Climate Centre}}, title = {{Early Warning, Early Action}}, institution = {Red Cross Red Crescent Climate Centre}, year = {2009}, url = {https://www.climatecentre.org/wp-content/uploads/EWEA-WCAZ-Evaluation.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document clicent-000134} }

Full text

Collected · Record updated