ABSA BANK LIMITED’S (ABSA) ROLE IN FINANCING THE PROPOSED THABAMETSI AND KHANYISA COAL - FIRED POWER PLANTS (“THE PROJECTS”)

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

Absa Bank Limited states that its risk assessment processes regarding the funding of the proposed Thabametsi and Khanyisa coal-fired power plants are still underway and will determine the bank's final position on the projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Absa Bank Limited has not yet reached a final decision on whether to fund the Thabametsi and Khanyisa coal-fired power plants, as its internal risk assessment processes are currently ongoing.

Cite the original document

APA
Centre for Environmental Rights (2018). ABSA BANK LIMITED’S (ABSA) ROLE IN FINANCING THE PROPOSED THABAMETSI AND KHANYISA COAL - FIRED POWER PLANTS (“THE PROJECTS”). https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779
Chicago
Centre for Environmental Rights. ABSA BANK LIMITED’S (ABSA) ROLE IN FINANCING THE PROPOSED THABAMETSI AND KHANYISA COAL - FIRED POWER PLANTS (“THE PROJECTS”). 2018. https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=ABSA BANK LIMITED’S (ABSA) ROLE IN FINANCING THE PROPOSED THABAMETSI AND KHANYISA COAL - FIRED POWER PLANTS (“THE PROJECTS”) |date=3 October 2018 |url=https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2018absa, author = {{Centre for Environmental Rights}}, title = {{ABSA BANK LIMITED’S (ABSA) ROLE IN FINANCING THE PROPOSED THABAMETSI AND KHANYISA COAL - FIRED POWER PLANTS (“THE PROJECTS”)}}, publisher = {Centre for Environmental Rights}, year = {2018}, month = oct, url = {https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated