Summary
A letter from Absa Group Limited to the Centre for Environmental Rights stating that the bank's risk assessment processes regarding the financing of the proposed Thabametsi and Khanyisa coal-fired power plants are still ongoing.
Key insights
- Absa Group Limited is currently conducting risk assessment processes to determine its position on providing funding for the proposed Thabametsi and Khanyisa coal-fired power plants.
- Absa states that its funding decisions are guided by a comprehensive risk management framework and stringent internal requirements and standards to ensure due care, skill, and diligence in investment opportunities.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). Scanned Document. https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779
- Chicago
- Centre for Environmental Rights. Scanned Document. n.d. https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779.
- Wikipedia
- {{cite press release |author=Centre for Environmental Rights |title=Scanned Document |url=https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{centreforenvironmentalrightsndscanned, author = {{Centre for Environmental Rights}}, title = {{Scanned Document}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2018/10/Ms-Melissa-Fourie-CER-3-October-2018.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated