This document is an Atmospheric Emission Licence (AEL) issued on 23 June 2015 by the Gert Sibande District Municipality to Eskom Holdings SOC Limited for the Majuba Power Station. The licence, granted under the National Environmental Management: Air Quality Act, 2004, serves as a provisional transfer from an APPA registration certificate to an AEL and is valid for a period not exceeding 12 months.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Atmospheric Emission Licence was issued to Eskom Holdings SOC Limited for the Majuba Power Station, covering Listed Activity Category 1 (Sub-category 1.1) and Category 5 (Sub-category 5.14). The licence is valid for a period not exceeding 12 months from the date of signature.
  • Majuba Power Station has a maximum permitted production capacity of 4,110 MW of electricity. Its regulated raw material consumption limits are 1,800,000 tons of coal per month and 6,000 tons of heavy fuel oil per month.
  • The facility utilizes two main stacks (Stack 1 and Stack 2), each with a height of 250 meters. These stacks serve boiler units 1-6 and operate continuously 24 hours a day.
  • Air pollution is controlled using pulse jet fabric filter plants for all boiler units (1-6), with a design minimum control efficiency of 95% and a minimum utilization of 100%.
  • The licence identifies several sources of fugitive dust and volatile organic compounds (VOCs), including the coal stockpile, ash dumps, fuel oil tanks, conveyor belts, and unpaved roads. For most of these area and line sources, specific parameters were required to be provided within six months of the licence issue date.
  • The licence holder is required to submit an Atmospheric Emission Management Plan within 12 months of the signature date. This plan must detail measures to achieve emission standards and manage point-source and fugitive emissions.
  • Eskom Majuba is required to implement an offset programme by 31 March 2016 to reduce PM pollution in the ambient receiving environment, with a definite implementation plan expected within six months of the licence issue.

Cite the original document

APA
Centre for Environmental Rights (n.d.). majuba-ael_23jun15-bf0219a23d0d4e31.pdf. https://cer.org.za/wp-content/uploads/2017/07/Majuba-AEL_23Jun15.pdf?x21779
Chicago
Centre for Environmental Rights. majuba-ael_23jun15-bf0219a23d0d4e31.pdf. n.d. https://cer.org.za/wp-content/uploads/2017/07/Majuba-AEL_23Jun15.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=majuba-ael_23jun15-bf0219a23d0d4e31.pdf |url=https://cer.org.za/wp-content/uploads/2017/07/Majuba-AEL_23Jun15.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndmajubaael23jun15bf0219a23d0d4e31pdf, author = {{Centre for Environmental Rights}}, title = {{majuba-ael\_23jun15-bf0219a23d0d4e31.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2017/07/Majuba-AEL_23Jun15.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated