hendrina-ael_31mar2016-083e4f9841af0b6e.pdf
Summary
This document is an Atmospheric Emission Licence (AEL) issued by the Nkangala District Municipality to Eskom Holdings SOC Limited for the Hendrina Power Station. The licence, varied on 31 March 2016, sets out the legal conditions, emission limits, and monitoring requirements for the station's operations under the National Environmental Management: Air Quality Act, 2004.
Key insights
- The Atmospheric Emission Licence (AEL) for the Hendrina Power Station was varied on 31 March 2016 and is valid until 31 March 2019.
- The Hendrina Power Station has a total capacity of 2000 MW, consisting of ten 200MW Boiler sets that use pulverised fuel (PF) fired boilers. The operational life of individual units is expected to last at least until 2025, with an annual installed plant load factor between 75% and 90%.
- The facility is authorised to conduct three listed activities: solid fuel combustion for steam raising or electricity generation (Category 1.1), storage of liquid petroleum products with a combined capacity exceeding 1000 cubic metres (Category 2.4), and storage and handling of coal not situated on a mine (Category 5.1).
- The station's maximum permitted raw material consumption is 820,000 tons of coal per month and 3,200 tons of fuel oil per month. The maximum design production capacity for electricity is 2000 MW, with a by-product of ash produced at a maximum permitted capacity of 290,000 tons per month.
- The licence mandates that both smoke stacks be equipped with continuous emission monitoring equipment for particulate matter (PM), sulphur dioxide (SO2), and nitrogen oxides (NOx) by 1 June 2015.
- Eskom Hendrina Power Station is required to provide an approved, time-bound Atmospheric Emission Off-Set Plan by 31 March 2016 to reduce PM pollution in the ambient or receiving environment.
- The facility is located within the Highveld Air Pollution Priority Area (HPA), and the licence holder must maintain an official Air Quality Complaints Register and submit annual reports to the Licensing Authority within 60 days of the end of each reporting period.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). hendrina-ael_31mar2016-083e4f9841af0b6e.pdf. https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_31Mar2016.pdf?x21779
- Chicago
- Centre for Environmental Rights. hendrina-ael_31mar2016-083e4f9841af0b6e.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_31Mar2016.pdf?x21779.
- Wikipedia
- {{cite press release |author=Centre for Environmental Rights |title=hendrina-ael_31mar2016-083e4f9841af0b6e.pdf |url=https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_31Mar2016.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{centreforenvironmentalrightsndhendrinaael31mar2016083e4f9841af0b6epdf, author = {{Centre for Environmental Rights}}, title = {{hendrina-ael\_31mar2016-083e4f9841af0b6e.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/06/Hendrina-AEL_31Mar2016.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated