Browse all documents

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from the South African Department of Environmental Affairs to Eskom requesting additional information regarding a postponement application for compliance with the 2015 Minimum Emission Standards for the Grootvlei Power Station.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Department of Environmental Affairs has placed Eskom's postponement application for compliance with the 2015 Minimum Emission Standards for the Grootvlei Power Station on hold due to insufficient data in three specific areas: ambient air quality monitoring graphs lack time series plots to show trends and exceedances, frequency plots do not accurately represent monitoring data (preventing observation of data gaps or pollutant evolution), and there is limited data for the PM2.5 health and environment impact assessment.

Cite the original document

APA
Centre for Environmental Rights (n.d.). eskom-grootvlei-10378d833b37f0e4.pdf. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Grootvlei.pdf?x21779
Chicago
Centre for Environmental Rights. eskom-grootvlei-10378d833b37f0e4.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Grootvlei.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=eskom-grootvlei-10378d833b37f0e4.pdf |url=https://cer.org.za/wp-content/uploads/2014/07/Eskom-Grootvlei.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndeskomgrootvlei10378d833b37f0e4pdf, author = {{Centre for Environmental Rights}}, title = {{eskom-grootvlei-10378d833b37f0e4.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/07/Eskom-Grootvlei.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated